QFR No - 8000877854
Defect Details
NC No. 8000877854
NC Date 11/06/2024
NC Submission Date
Part No. 550BZ01402
Part Name CAP OIL LOCK - DF01
Supplier Name & Code 101255-MAHAVIR INDUSTRIES
ETL Plant 1117-ETL K-228/9 Suspension
Defect Details NOT AS PER SPECIFICATION-ID OUT
 
1. Problem Description
Defect Description ID wall thickness variation
Detection Stage Inprocess
Problem Severity Function
NG Quantity 2
Is Defect Repeatative? No
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID quality@mahavirind.co.in
Plant Head/CEO Email ID planthead@mahavirind.co.in
MD Email ID
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
680
0
0
0
1280
1960
Check Qty
680
0
0
0
1280
1960
NG Qty
2
0
0
0
0
2
 
Scrap 2
Rework 0
Under Deviation 0
Containment Action
All Suspected Material Segregation At Customer End
 
3. Process Flow
Process Flow Description
R/M Inward-store-Parting & Pilot Drill -Bottom side chamfer-CNC-ID boring and Turning -OD Grinding -Plating- Final Inspection-Dispatch.
 
4. Process Details
Process / Operation Parting & Pilot Drill
Outsource Yes
Machine / Cell Traub M/C
Machine / Cell No. Traub No.2
5. Problem Analysis
Type Possible Cause Fact Verification Jud
ToolWrong tool use for Pilot drillYes , Long length Drill Use For pilot drill operation on Traub machineX
ManUnskilled operatorSkilled Operator On Traub MachineO
MethodParting & Pilot Drill Process wrong and Gauge Not Available.Parting Process on Traub Machine But Concentricity Gauge Not Available On CNC Machine.X
MaterialWrong grade &Hard Material useMaterial Grade-EN1A and Hardness -87HRBO
MachineMachine Condition Not OkAs per PM Check sheet Traub Machine Condition had OK .O
 
6. Inspection Method Analysis (Current)
Inspection Method Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. Sampling
Sampling No
Sample Size 20 NOS
7. Root Cause Analysis (Occurance)
Why 1 NOT AS PER SPECIFICATION-ID OUT
Why 2 Concentricity Problem observed During Piolet Drilling Process on Traub Machine.
Why 3 Piolet Drill Vibrate On Traub Machine during Piolet Drill Operation
Why 4 Piolet Drill had Over length Than Required .
Why 5
Root Cause (Occurance) Piolet Drill had Over length Than Required
 
Root Cause Analysis (Outflow)
Why 1 NOT AS PER SPECIFICATION-ID OUT
Why 2 Sample Basis and Visual Inspection On CNC Machine.
Why 3 Concentricity Gauge not Available On CNC machine.
Why 4
Why 5
Root Cause (Outflow) Concentricity Gauge not Available On CNC machine.
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OccurancePiolet Drill Replace as per Required LengthTraub Operator / Line Inspector13/06/202413/06/2024Completed
OutflowConcentricity Gauge Provide On CNC Machine.QA Incharge.22/06/202422/06/2024Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System Yes
Change Details Concentricity Parameter 100% Verifying on CNC Machine.
Inspection Method Sp. Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. Sampling
Sampling No
Sample Size 20nos / Hr
10. Evidance of Countermeasure
Occurance (Before) Piolet Drill had Over length Than Required
854_Occurance_Before.jpg
Occurance (After) Piolet Drill Replace as per Required Length
854_Occurance_After.docx
Outflow (Before) Concentricity Gauge not Available On CNC machine.
854_Outflow_Before.jpg
Outflow (After) Concentricity Gauge Provide On CNC Machine.
854_Outflow_After.docx
 
11. Horizontal Deployment
Horizontal Deployment Required Yes
Applicable Machine / Model / Plant All Cap OIL locks Family
 
12. Document Review
Documents ControlPlan, PFMEA
Specify Other Document no
 
13. Effectiveness Of Action
Reviewed Quantity 50
Reason for submission OK