QFR No - 8000879364
Defect Details
NC No. 8000879364
NC Date 22/06/2024
NC Submission Date
Part No. 550PC09107
Part Name UNDER BKT M/C (CT100)
Supplier Name & Code 101222-SANGKAJ ENGINEERING PVT LTD- U
ETL Plant 1117-ETL K-228/9 Suspension
Defect Details THREADING NOT OK-UNDER BKT RUSTY
 
1. Problem Description
Defect Description UNDER BKT RUSTY
Detection Stage Receipt
Problem Severity Aesthetic
NG Quantity 40
Is Defect Repeatative? Yes
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID aslam@sangkaj.com
Plant Head/CEO Email ID steel@sangkaj.com
MD Email ID anirudh.2007@hotmail.com
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
598
0
0
600
0
1198
Check Qty
598
0
0
600
0
1198
NG Qty
40
0
0
12
0
52
 
Scrap 0
Rework 52
Under Deviation 0
Containment Action
checked All ETL End and SEPL End stock
 
3. Process Flow
Process Flow Description
forging inward- pre drilling- ruff boring- 5.1 drilling -boss drilling-lug milling- slitting-counter drilling-M6 tapping-M8 tapping-final inspection-dispatch.
 
4. Process Details
Process / Operation Sliiting
Outsource No
Machine / Cell Ubkt semifinish line
Machine / Cell No. 01
5. Problem Analysis
Type Possible Cause Fact Verification Jud
ManAnti rust oil application not doneverified anti rust oil application not done properlyX
MachineCoolant concentration not as per Cantrol planverified coolant concentration not ok as per cantrol planX
MethodINSPECTION NOT DONE AS PER SOPVERIFRIED INSPECTION DONE AS PER SOPO
Materialraw material receipt rustyverified material receipt okO
 
6. Inspection Method Analysis (Current)
Inspection Method Other
Other Inspection Method Visual inspection
Check Point at Final Inspection Yes
Checking Freq. Sampling
Sampling No
Sample Size 5 nos
7. Root Cause Analysis (Occurance)
Why 1 UNDER BKT RUSTY
Why 2 coolant concentration found at not ok as per cantrol plan
Why 3 operator not top-up cutting oil after water refilling
Why 4 unskilled operator
Why 5
Root Cause (Occurance) coolant concentration found at not ok as per control plan.
 
Root Cause Analysis (Outflow)
Why 1 UNDER BKT RUSTY
Why 2 Anti rust oil application not done properly
Why 3 unskilled inspector
Why 4
Why 5
Root Cause (Outflow) skipped form inspection
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
Outflowtraining given to all new unskilled inspector for anti rust oil application.mr.sonawane29/06/202402/07/2024Completed
Occuranceafter top-up water & cutting oil checking started.mr.dhage29/06/202402/07/2024Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System No
Change Details no change
Inspection Method Other
Other Inspection Method visual inspection.
Check Point at Final Inspection Yes
Checking Freq. Sampling
Sampling No
Sample Size 5 nos
10. Evidance of Countermeasure
Occurance (Before) coolant concentration not checked after top-up
883_Occurance_Before.jfif
Occurance (After) coolant concentration checking started after top-up
883_Occurance_After.jfif
Outflow (Before) anti rust oil application not done properly
883_Outflow_Before.jfif
Outflow (After) Training given to all inspector for anti rust oil application
883_Outflow_After.jfif
 
11. Horizontal Deployment
Horizontal Deployment Required No
Applicable Machine / Model / Plant N/A
 
12. Document Review
Documents WISOP
Specify Other Document Work Instruction
 
13. Effectiveness Of Action
Reviewed Quantity 150
Reason for submission OK