QFR No - 8000879506
Defect Details
NC No. 8000879506
NC Date 22/06/2024
NC Submission Date
Part No. 550BZ01402
Part Name CAP OIL LOCK - DF01
Supplier Name & Code 101255-MAHAVIR INDUSTRIES
ETL Plant 1146-ETL Suspension Narasapura
Defect Details DIMN.O/SIZE.-CONCENTRICITY MORE ISSUE
 
1. Problem Description
Defect Description CAP OIL LOCK - DF01 CONCENTRICITY MORE ISSUE
Detection Stage Receipt
Problem Severity Fitment
NG Quantity 1480
Is Defect Repeatative? No
Defect Sketch / Photo i2z4kjrrzalkbmbwopa4sgmv.gif
Supplier Communication Details
Quality Head Email ID quality@mahavirind.co.in
Plant Head/CEO Email ID planthead@mahavirind.co.in
MD Email ID
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
2780
12000
0
0
6000
20780
Check Qty
2780
12000
0
0
6000
20780
NG Qty
1480
0
0
0
0
1480
 
Scrap 1480
Rework 0
Under Deviation 0
Containment Action
All Suspected Material Segregation At Customer End
 
3. Process Flow
Process Flow Description
R/M Inward-store-Parting & Pilot Drill on Traub -Bottom side chamfer on Drill M/C-CNC-ID boring and Turning -OD Grinding -Plating- Final Inspection-Dispatch
 
4. Process Details
Process / Operation Parting & Pilot Drill on Traub
Outsource Yes
Machine / Cell Traub A-25 No.2
Machine / Cell No. Traub Section
5. Problem Analysis
Type Possible Cause Fact Verification Jud
MethodParting & Pilot Drill Pprocess wrong and Gauge Not AvailableParting Process on Traub Machine But Concentricity Gauge Not AvailableX
ToolWrong tool use for Pilot drillYes , Over length Drill Use For pilot drill operation on Traub machineX
MaterialWrong grade &Hard Material useMaterial Grade-EN1A and Hardness -87HRBO
MachineMachine Condition Not OkAs per PM Check sheet Traub Machine Condition had OKO
ManUnskilled operatorSkilled Operator On Traub MachineO
 
6. Inspection Method Analysis (Current)
Inspection Method Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100%
7. Root Cause Analysis (Occurance)
Why 1 DIMN.O/SIZE.-CONCENTRICITY MORE ISSUE
Why 2 Concentricity Problem observed During Piolet Drilling Process on Traub Machine
Why 3 Piolet Drill Vibrate On Traub Machine during Piolet Drill Operation
Why 4 Piolet Drill had Over length Than Required
Why 5
Root Cause (Occurance) Piolet Drill had Over length Than Required
 
Root Cause Analysis (Outflow)
Why 1 DIMN.O/SIZE.-CONCENTRICITY MORE ISSUE
Why 2 Sample Basis and Visual Inspection On CNC Machine.
Why 3 Concentricity Gauge not Available On CNC machine.
Why 4
Why 5
Root Cause (Outflow) Concentricity Gauge not Available On CNC machine.
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OccurancePiolet Drill Replace as per Required LengthTraub Operator / Line Inspector01/07/202402/07/2024Completed
OutflowConcentricity Gauge Provide On CNC MachineQA Incharge.10/07/202411/07/2024Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System Yes
Change Details Concentricity Parameter 100% Verifying on CNC Machine.
Inspection Method Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100%
10. Evidance of Countermeasure
Occurance (Before) Piolet Drill had Over length Than Required
878_Occurance_Before.jpg
Occurance (After) Piolet Drill Replace as per Required Length
878_Occurance_After.docx
Outflow (Before) Concentricity Gauge not Available On CNC machine
878_Outflow_Before.jpg
Outflow (After) Concentricity Gauge Provide On CNC Machine.
878_Outflow_After.docx
 
11. Horizontal Deployment
Horizontal Deployment Required Yes
Applicable Machine / Model / Plant All Cap OIL locks Family
 
12. Document Review
Documents ControlPlan, PFMEA
Specify Other Document NO
 
13. Effectiveness Of Action
Reviewed Quantity 10000
Reason for submission verified after improvement lot found ok