QFR No - 8000879506
Defect Details
NC No. | 8000879506 |
NC Date | 22/06/2024 |
NC Submission Date | |
Part No. | 550BZ01402 |
Part Name | CAP OIL LOCK - DF01 |
Supplier Name & Code | 101255-MAHAVIR INDUSTRIES |
ETL Plant | 1146-ETL Suspension Narasapura |
Defect Details | DIMN.O/SIZE.-CONCENTRICITY MORE ISSUE |
1. Problem Description
Defect Description | CAP OIL LOCK - DF01 CONCENTRICITY MORE ISSUE |
Detection Stage | Receipt |
Problem Severity | Fitment |
NG Quantity | 1480 |
Is Defect Repeatative? | No |
Defect Sketch / Photo | i2z4kjrrzalkbmbwopa4sgmv.gif |
Supplier Communication Details
Quality Head Email ID | quality@mahavirind.co.in |
Plant Head/CEO Email ID | planthead@mahavirind.co.in |
MD Email ID |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
2780
|
12000
|
0
|
0
|
6000
|
20780
|
Check Qty |
2780
|
12000
|
0
|
0
|
6000
|
20780
|
NG Qty |
1480
|
0
|
0
|
0
|
0
|
1480
|
Scrap | 1480 |
Rework | 0 |
Under Deviation | 0 |
Containment Action |
---|
All Suspected Material Segregation At Customer End |
3. Process Flow
Process Flow Description |
---|
R/M Inward-store-Parting & Pilot Drill on Traub -Bottom side chamfer on Drill M/C-CNC-ID boring and Turning -OD Grinding -Plating- Final Inspection-Dispatch |
4. Process Details
Process / Operation | Parting & Pilot Drill on Traub |
Outsource | Yes |
Machine / Cell | Traub A-25 No.2 |
Machine / Cell No. | Traub Section |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|---|---|---|
Method | Parting & Pilot Drill Pprocess wrong and Gauge Not Available | Parting Process on Traub Machine But Concentricity Gauge Not Available | X |
Tool | Wrong tool use for Pilot drill | Yes , Over length Drill Use For pilot drill operation on Traub machine | X |
Material | Wrong grade &Hard Material use | Material Grade-EN1A and Hardness -87HRB | O |
Machine | Machine Condition Not Ok | As per PM Check sheet Traub Machine Condition had OK | O |
Man | Unskilled operator | Skilled Operator On Traub Machine | O |
6. Inspection Method Analysis (Current)
Inspection Method | Gauge |
Other Inspection Method | |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | 100% |
7. Root Cause Analysis (Occurance)
Why 1 | DIMN.O/SIZE.-CONCENTRICITY MORE ISSUE |
Why 2 | Concentricity Problem observed During Piolet Drilling Process on Traub Machine |
Why 3 | Piolet Drill Vibrate On Traub Machine during Piolet Drill Operation |
Why 4 | Piolet Drill had Over length Than Required |
Why 5 | |
Root Cause (Occurance) | Piolet Drill had Over length Than Required |
Root Cause Analysis (Outflow)
Why 1 | DIMN.O/SIZE.-CONCENTRICITY MORE ISSUE |
Why 2 | Sample Basis and Visual Inspection On CNC Machine. |
Why 3 | Concentricity Gauge not Available On CNC machine. |
Why 4 | |
Why 5 | |
Root Cause (Outflow) | Concentricity Gauge not Available On CNC machine. |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|---|---|---|---|---|
Occurance | Piolet Drill Replace as per Required Length | Traub Operator / Line Inspector | 01/07/2024 | 02/07/2024 | Completed |
Outflow | Concentricity Gauge Provide On CNC Machine | QA Incharge. | 10/07/2024 | 11/07/2024 | Completed |
9. Inspection Method After Customer Complaint
Change In Inspection System | Yes |
Change Details | Concentricity Parameter 100% Verifying on CNC Machine. |
Inspection Method | Gauge |
Other Inspection Method | |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | 100% |
10. Evidance of Countermeasure
Occurance (Before) |
Piolet Drill had Over length Than Required 878_Occurance_Before.jpg |
Occurance (After) |
Piolet Drill Replace as per Required Length 878_Occurance_After.docx |
Outflow (Before) |
Concentricity Gauge not Available On CNC machine 878_Outflow_Before.jpg |
Outflow (After) |
Concentricity Gauge Provide On CNC Machine. 878_Outflow_After.docx |
11. Horizontal Deployment
Horizontal Deployment Required | Yes |
Applicable Machine / Model / Plant | All Cap OIL locks Family |
12. Document Review
Documents | ControlPlan, PFMEA |
Specify Other Document | NO |
13. Effectiveness Of Action
Reviewed Quantity | 10000 |
Reason for submission | verified after improvement lot found ok |