QFR No - 8000884393
Defect Details
NC No. 8000884393
NC Date 27/07/2024
NC Submission Date
Part No. 520KT00102
Part Name ROD BUSH
Supplier Name & Code 100177-SPECIALITY SINTERED PRODUCTS P
ETL Plant 1136-ETL Suspension Sanand
Defect Details LENGTH UNDERSIZE-TOTAL LENTGH UNDERSIZE 5.174 AGAINST 5.5
 
1. Problem Description
Defect Description Dimension width specification 5.5 (0.1/-0.1) mm found undersize 5.174 mm
Detection Stage Warranty
Problem Severity Function
NG Quantity 1
Is Defect Repeatative? No
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID
Plant Head/CEO Email ID
MD Email ID
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
--
--
--
--
--
--
Check Qty
--
--
--
--
--
--
NG Qty
--
--
--
--
--
--
 
Scrap
Rework
Under Deviation
Containment Action
--
 
3. Process Flow
Process Flow Description
--
 
4. Process Details
Process / Operation
Outsource
Machine / Cell
Machine / Cell No.
5. Problem Analysis
-------
Type Possible Cause Fact Verification Jud
 
6. Inspection Method Analysis (Current)
Inspection Method
Other Inspection Method
Check Point at Final Inspection
Checking Freq.
Sampling
Sample Size
7. Root Cause Analysis (Occurance)
Why 1
Why 2
Why 3
Why 4
Why 5
Root Cause (Occurance)
 
Root Cause Analysis (Outflow)
Why 1
Why 2
Why 3
Why 4
Why 5
Root Cause (Outflow)
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
-------
Type Countermeasure Details Responsibility Target Date Actual Date Status
 
9. Inspection Method After Customer Complaint
Change In Inspection System
Change Details
Inspection Method
Other Inspection Method
Check Point at Final Inspection
Checking Freq.
Sampling
Sample Size
10. Evidance of Countermeasure
Occurance (Before)
Occurance (After)
Outflow (Before)
Outflow (After)
 
11. Horizontal Deployment
Horizontal Deployment Required
Applicable Machine / Model / Plant
 
12. Document Review
Documents
Specify Other Document
 
13. Effectiveness Of Action
Reviewed Quantity
Reason for submission