QFR No - 8000886625
Defect Details
NC No. 8000886625
NC Date 12/08/2024
NC Submission Date
Part No. F2DZ07203B
Part Name FORK BOLT (K-9207) Ni+Cr Plated
Supplier Name & Code 100539-N P ENTERPRISES
ETL Plant 1117-ETL K-228/9 Suspension
Defect Details NOT AS PER SPECIFICATION-RUSTY
 
1. Problem Description
Defect Description Rusty - Not as per specification
Detection Stage Receipt
Problem Severity Aesthetic
NG Quantity 77
Is Defect Repeatative? Yes
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID quality@npcindustries.in
Plant Head/CEO Email ID anand@npcindustries.in
MD Email ID ajay@npcindustries.in
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
750
1800
0
0
0
2550
Check Qty
750
1800
0
0
0
2550
NG Qty
77
13
0
0
0
90
 
Scrap 0
Rework 90
Under Deviation 0
Containment Action
100% visual inspection of available qty.
 
3. Process Flow
Process Flow Description
1-Raw Material Receipt 2- Cutting & Forging 1st 3-Annealing 4-Phosphating 5-Forging - 2nd 6-CNC1st 7-CNC 2nd 8-Thread Rolling 9-Drilling 10-Buffing 11-Head Polishing 12-Plating 13-Final Inspection 14-Packing & Dispatch
 
4. Process Details
Process / Operation Plating
Outsource Yes
Machine / Cell Plating Set Up
Machine / Cell No. Plating Tank
5. Problem Analysis
Type Possible Cause Fact Verification Jud
ManOperator unaware about processOperator found to be aware about the processO
MethodIncoming material for plating rustyIncoming material for Plating observed to be rustyX
ManPlating operator negligentOperator found to be not negligentO
MaterialMaterial not as per drawingMaterial observed as per drawingO
MethodNG part could not be detected at final inspectionIt was observed that NG part skipped final inspectionX
 
6. Inspection Method Analysis (Current)
Inspection Method Other
Other Inspection Method Visual
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100%
7. Root Cause Analysis (Occurance)
Why 1 Incoming material for Plating observed to be rusty
Why 2 Rusted material received by Plating Supplier
Why 3 Parts became rusted during transit
Why 4 Parts not dipped in RPO before dispatch
Why 5
Root Cause (Occurance) Parts not dipped in RPO before dispatch
 
Root Cause Analysis (Outflow)
Why 1 NG parts could not be detected at Final Inspection
Why 2 NG parts got skipped at Final Inspection
Why 3 No rust observed at the time of dispatch
Why 4 Curing time not given to parts before dispatch
Why 5
Root Cause (Outflow) Curing time not given to parts before dispatch
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OccuranceQuality Alert to be displayed at Final Dispatch Station at NP NabhaMr Thakur12/08/202412/08/2024Completed
OccuranceParts to be dipped in RPO before disptach to Plating SupplierMr Thakur27/08/202426/08/2024Completed
OccuranceWI for RPO dipping of parts to be displayed at Final Dispatch StationMr Thakur27/08/202426/08/2024Completed
OutflowCuring time of 24 hrs to be given to parts before dispatchMr Ganesh22/08/202422/08/2024Completed
OutflowQuality Alert to be displayed at M/s ZumtaraMr Ganesh13/08/202413/08/2024Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System No
Change Details NA
Inspection Method Other
Other Inspection Method Visual
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100%
10. Evidance of Countermeasure
Occurance (Before) Parts not dipped with RPO before dispatch
1016_Occurance_Before.jpg
Occurance (After) Parts dipped with RPO before dispatch
1016_Occurance_After.jpg
Outflow (Before) 100% inspection but no marking
1016_Outflow_Before.jpg
Outflow (After) 100% marking after inspection
1016_Outflow_After.jpg
 
11. Horizontal Deployment
Horizontal Deployment Required No
Applicable Machine / Model / Plant NA
 
12. Document Review
Documents ControlPlan, PFMEA, WISOP, ProcessFlowChart
Specify Other Document NA
 
13. Effectiveness Of Action
Reviewed Quantity 50
Reason for submission ok