QFR No - 8000887428
Defect Details
NC No. | 8000887428 |
NC Date | 20/08/2024 |
NC Submission Date | |
Part No. | B2FP05313O |
Part Name | HOLDER BRACKET FINISHED-RE J1 REAR |
Supplier Name & Code | 201092-PRANEEL INDUSTRIES |
ETL Plant | 1120-ETL K-226/2 Disc Brakes |
Defect Details | DENT MARK-DENT DAMAGE |
1. Problem Description
Defect Description | DENT MARK-DENT DAMAGE |
Detection Stage | Inprocess |
Problem Severity | Aesthetic |
NG Quantity | 186 |
Is Defect Repeatative? | Yes |
Defect Sketch / Photo |
Supplier Communication Details
Quality Head Email ID | quality@praneelgroup.com |
Plant Head/CEO Email ID | praneelindustries@rediiffmail.com |
MD Email ID | anilpatil@praneelgroup.com |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
420
|
0
|
0
|
130
|
0
|
550
|
Check Qty |
420
|
0
|
0
|
130
|
0
|
550
|
NG Qty |
186
|
0
|
0
|
3
|
0
|
189
|
Scrap | 189 |
Rework | 0 |
Under Deviation | 0 |
Containment Action |
---|
All material at ETL end and In-house Finish Good material sagrigation done and NG material rejected. |
3. Process Flow
Process Flow Description |
---|
Raw material inward=>Powder coating=>Powder coating inward=>VMC 1st setup=> VMC 2nd setup=>Final inspection=>Packing and Dispatch. |
4. Process Details
Process / Operation | Machining |
Outsource | No |
Machine / Cell | VMC Machining |
Machine / Cell No. | VMC Cell |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|---|---|---|
Material | Material not as per drawing. | Verify the material and found as per drawing. | O |
Tool | Required tooling not as per specifications. | Verify the tooling on machine,found adequate. | O |
Method | Packing method not as per packing standard. | Verify the packing standard and found inadequate. | X |
Machine | Machine clamping pressure not as required. | Verify the machine clamping pressure on machine and found as per CP. | O |
Man | Unskilled operator and inspector on machine and final inspection. | Verify skill matrix of operator and inspector ,found as per skill matrix. | O |
6. Inspection Method Analysis (Current)
Inspection Method | Other |
Other Inspection Method | Visual Inspection |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | samp.plan |
7. Root Cause Analysis (Occurance)
Why 1 | Holder Bracket REJ1C Rear found dent and damage on the parts. |
Why 2 | Operator unaware of material handling and packing |
Why 3 | Unskilled operator of packing. |
Why 4 | Stage wise material movement is improper |
Why 5 | |
Root Cause (Occurance) | Stage wise material movement is improper. |
Root Cause Analysis (Outflow)
Why 1 | Holder Bracket REJ1C Rear found dent and damage on the parts. |
Why 2 | Phenomenon skip during visual inspection |
Why 3 | Inspector not aware about defects occurs. |
Why 4 | |
Why 5 | |
Root Cause (Outflow) | Inspector not aware about defects occurs. |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|---|---|---|---|---|
Occurance | Stage wise material handling made and display on the shop floor to avoid dent and damage issue on parts. | Mr.Sudarshan Kadam | 26/08/2024 | 26/08/2024 | Completed |
Outflow | Training and awareness given to Inspector about unknown defects received at ETL End. | Mr.Yogesh Sonune | 24/08/2024 | 24/08/2024 | Completed |
9. Inspection Method After Customer Complaint
Change In Inspection System | Yes |
Change Details | Inspection done as per eye sequence chart display on the inspection table. |
Inspection Method | Other |
Other Inspection Method | Visual Inspection |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | 100% |
10. Evidance of Countermeasure
Occurance (Before) |
Before material handle in the box for machining. 1031_Occurance_Before.jpeg |
Occurance (After) |
After stage wise material handling display on the shop floor for material handling. 1031_Occurance_After.xlsx |
Outflow (Before) |
Before awareness not available about raise defects to inspector. 1031_Outflow_Before.jpeg |
Outflow (After) |
Training and Awareness given to Inspector with Q-Alert display on final inspection table. 1031_Outflow_After.xlsx |
11. Horizontal Deployment
Horizontal Deployment Required | Yes |
Applicable Machine / Model / Plant | All Holder Brackets and shop floor . |
12. Document Review
Documents | WISOP, PackingStd, InspCheckSheet |
Specify Other Document | Q-Alert |
13. Effectiveness Of Action
Reviewed Quantity | 150 |
Reason for submission | Seen improvement in dent/damage issue. |