QFR No - 8000894023
Defect Details
NC No. | 8000894023 |
NC Date | 01/10/2024 |
NC Submission Date | |
Part No. | 530DA00507 |
Part Name | TOP SPRING LOCATOR |
Supplier Name & Code | 100161-PREMIER ENGINEERS |
ETL Plant | 1118-ETL E-92,93 Suspension |
Defect Details | POWDER COATING NOT OK-POWDER COATING PEEL OFF |
1. Problem Description
Defect Description | POWDER COATING PEEL OFF |
Detection Stage | Inprocess |
Problem Severity | Aesthetic |
NG Quantity | 106 |
Is Defect Repeatative? | Yes |
Defect Sketch / Photo |
Supplier Communication Details
Quality Head Email ID | quality.premier@sanghavigroup.co.in |
Plant Head/CEO Email ID | prabhune.girish@sanghavigroup.co.in |
MD Email ID | sanghavi.rajesh@sanghavigroup.co.in |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
208
|
0
|
0
|
0
|
0
|
208
|
Check Qty |
208
|
0
|
0
|
0
|
0
|
208
|
NG Qty |
106
|
0
|
0
|
0
|
0
|
106
|
Scrap | 106 |
Rework | 0 |
Under Deviation | 0 |
Containment Action |
---|
Available lot Qty 208 Nos Segregated for peel off Issue by heating Method. |
3. Process Flow
Process Flow Description |
---|
RM+Forming +Piercing+Vibro+Powder coating+final Inspection+Dispatch |
4. Process Details
Process / Operation | Powder Caoting |
Outsource | Yes |
Machine / Cell | Tulja Enterprises |
Machine / Cell No. | Powder Coating L |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|---|---|---|
Method | Excess Powder Coating at OD edge | Due to new coater powder coating observed excess on part Edge | O |
6. Inspection Method Analysis (Current)
Inspection Method | Other |
Other Inspection Method | DFT meter Inspection |
Check Point at Final Inspection | Yes |
Checking Freq. | Sampling |
Sampling | No |
Sample Size | DFT Chech |
7. Root Cause Analysis (Occurance)
Why 1 | TSL Powder Coating Peel off at Edge |
Why 2 | Powder Coating Thickness Observed More on part Edge |
Why 3 | Excess powder observed ( more than 120Micron )observed on Edge |
Why 4 | New Coater in place of regular coater absentism |
Why 5 | No new coater powder spraying training for powder DFT 60 to 70 |
Root Cause (Occurance) | Excess powder coating on part and its Edge |
Root Cause Analysis (Outflow)
Why 1 | TSL Powder Coating Peel off at Edge |
Why 2 | Not detected at final Inspection stage |
Why 3 | Sampling basis DFT verification |
Why 4 | visual method of 100% Inspection not followed |
Why 5 | |
Root Cause (Outflow) | Sampling basis DFT verification |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|---|---|---|---|---|
Outflow | Inspection frequency increased for DFT verification and 100& visual inspection followed for Excess coating on Edge | Mr.Vishal | 15/10/2024 | Completed | |
Occurance | Training provided to available coater for Powder Coating thickness within 60-70 Micron | Mr.Mahendra Patil | 15/10/2024 | Completed |
9. Inspection Method After Customer Complaint
Change In Inspection System | Yes |
Change Details | Inspection Qty increased for DFT Inspection also 100% powder verification at edge for excess powder coating |
Inspection Method | Other |
Other Inspection Method | Double sampling |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | 20/100 |
10. Evidance of Countermeasure
Occurance (Before) |
Excess Coating 1126_Occurance_Before.pdf |
Occurance (After) |
No Excess Coating training provided to coater. 1126_Occurance_After.jpg |
Outflow (Before) |
No Training to Coater, Coater Training provided 1126_Outflow_Before.pdf |
Outflow (After) |
Training Provided to Coater 1126_Outflow_After.pdf |
11. Horizontal Deployment
Horizontal Deployment Required | Yes |
Applicable Machine / Model / Plant | Other Locator also |
12. Document Review
Documents | WISOP |
Specify Other Document | Final Training |
13. Effectiveness Of Action
Reviewed Quantity | 1000 |
Reason for submission | After taking action no powder coating peel off observed on part. |