QFR No - 8000897821
Defect Details
NC No. 8000897821
NC Date 29/10/2024
NC Submission Date
Part No. 520PA01602
Part Name TUBE RING BOTTOM
Supplier Name & Code 101255-MAHAVIR INDUSTRIES
ETL Plant 1118-ETL E-92,93 Suspension
Defect Details ID UNDERSIZE-ID U/S SPE=29.0+/-0.10 OBS=28.40
 
1. Problem Description
Defect Description ID UNDERSIZE-ID U/S SPE=29.0+/-0.10 OBS=28.40
Detection Stage Inprocess
Problem Severity Fitment
NG Quantity 49
Is Defect Repeatative? No
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID quality@mahavirind.co.in
Plant Head/CEO Email ID planthead@mahavirind.co.in
MD Email ID
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
1800
0
0
0
0
1800
Check Qty
1800
0
0
0
0
1800
NG Qty
49
0
0
0
0
49
 
Scrap 49
Rework 0
Under Deviation 0
Containment Action
All Material segregation at Customer End
 
3. Process Flow
Process Flow Description
RM inward - store - Traub Machining -1 -chamfer Machining -2- Final Inspection - Packing - Dispatch - Transport
 
4. Process Details
Process / Operation Traub Machining
Outsource Yes
Machine / Cell Traub No, 5
Machine / Cell No. Traub Section
5. Problem Analysis
Type Possible Cause Fact Verification Jud
MethodParting Machining Method Change , Inspection Method ChangeTraub Machining Method is Correct But pipe ID not Inspection Before parting on Parting Process..X
MaterialWrong Size And other grade Material UseGrade was ok but ID under size Pipe Mix With ok Raw Material .X
ToolWrong Chamfer Tool UseNo, Insert Type Chamfer Tool Use on chamfer machine .O
MachineMachine Condition Not OkAs Per PM schedule Traub Machine Found OkO
ManUnskilled operatorAs per Skilled Matrix Operator is skilledO
 
6. Inspection Method Analysis (Current)
Inspection Method Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. Sampling
Sampling No
Sample Size 20nos
7. Root Cause Analysis (Occurance)
Why 1 D UNDERSIZE-ID U/S
Why 2 ID Under size One Pipe mix With Ok Regular Raw Material.
Why 3 Operator Not aware for ID under size. In Regular Operation.
Why 4
Why 5
Root Cause (Occurance) ID Under size One Pipe mix With Ok Regular Raw Material.
 
Root Cause Analysis (Outflow)
Why 1 D UNDERSIZE-ID U/S
Why 2 ID Under size One Pipe mix With Ok Regular Raw Material.
Why 3 The operator on the Traub machine did not check the first parting piece after loading a new pipe.
Why 4 Operator Not aware for ID under size. In Regular Operation.
Why 5
Root Cause (Outflow) The operator on the Traub machine did not check the first parting piece after loading a new pipe.
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OccuranceWork Instructions Display on Traub Machine for Operator AwarenessProduction Incharge08/11/202407/11/2024Completed
OutflowPlug Gauge Provide On Traub Machine for check the first parting piece after loading a new pipe.Quality Head17/11/202416/11/2024Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System Yes
Change Details Plug Gauge Provide On Traub Machine for check the first parting piece after loading each and Every a New Pipe
Inspection Method Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. Sampling
Sampling No
Sample Size 20Pcs
10. Evidance of Countermeasure
Occurance (Before) ID Under size One Pipe mix With Ok Regular Raw Material.
1196_Occurance_Before.docx
Occurance (After) Work Instructions Display on Traub Machine for Operator Awareness.
1196_Occurance_After.docx
Outflow (Before) The operator on the Traub machine did not check the first parting piece after loading a new pipe.
1196_Outflow_Before.docx
Outflow (After) lug Gauge Provide On Traub Machine for check the first parting piece after loading a new pipe.
1196_Outflow_After.xlsx
 
11. Horizontal Deployment
Horizontal Deployment Required Yes
Applicable Machine / Model / Plant All Tube Rings
 
12. Document Review
Documents ControlPlan, PFMEA, WISOP
Specify Other Document No
 
13. Effectiveness Of Action
Reviewed Quantity
Reason for submission