QFR No - 8000897821
Defect Details
NC No. | 8000897821 |
NC Date | 29/10/2024 |
NC Submission Date | |
Part No. | 520PA01602 |
Part Name | TUBE RING BOTTOM |
Supplier Name & Code | 101255-MAHAVIR INDUSTRIES |
ETL Plant | 1118-ETL E-92,93 Suspension |
Defect Details | ID UNDERSIZE-ID U/S SPE=29.0+/-0.10 OBS=28.40 |
1. Problem Description
Defect Description | ID UNDERSIZE-ID U/S SPE=29.0+/-0.10 OBS=28.40 |
Detection Stage | Inprocess |
Problem Severity | Fitment |
NG Quantity | 49 |
Is Defect Repeatative? | No |
Defect Sketch / Photo |
Supplier Communication Details
Quality Head Email ID | quality@mahavirind.co.in |
Plant Head/CEO Email ID | planthead@mahavirind.co.in |
MD Email ID |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
1800
|
0
|
0
|
0
|
0
|
1800
|
Check Qty |
1800
|
0
|
0
|
0
|
0
|
1800
|
NG Qty |
49
|
0
|
0
|
0
|
0
|
49
|
Scrap | 49 |
Rework | 0 |
Under Deviation | 0 |
Containment Action |
---|
All Material segregation at Customer End |
3. Process Flow
Process Flow Description |
---|
RM inward - store - Traub Machining -1 -chamfer Machining -2- Final Inspection - Packing - Dispatch - Transport |
4. Process Details
Process / Operation | Traub Machining |
Outsource | Yes |
Machine / Cell | Traub No, 5 |
Machine / Cell No. | Traub Section |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|---|---|---|
Method | Parting Machining Method Change , Inspection Method Change | Traub Machining Method is Correct But pipe ID not Inspection Before parting on Parting Process.. | X |
Material | Wrong Size And other grade Material Use | Grade was ok but ID under size Pipe Mix With ok Raw Material . | X |
Tool | Wrong Chamfer Tool Use | No, Insert Type Chamfer Tool Use on chamfer machine . | O |
Machine | Machine Condition Not Ok | As Per PM schedule Traub Machine Found Ok | O |
Man | Unskilled operator | As per Skilled Matrix Operator is skilled | O |
6. Inspection Method Analysis (Current)
Inspection Method | Gauge |
Other Inspection Method | |
Check Point at Final Inspection | Yes |
Checking Freq. | Sampling |
Sampling | No |
Sample Size | 20nos |
7. Root Cause Analysis (Occurance)
Why 1 | D UNDERSIZE-ID U/S |
Why 2 | ID Under size One Pipe mix With Ok Regular Raw Material. |
Why 3 | Operator Not aware for ID under size. In Regular Operation. |
Why 4 | |
Why 5 | |
Root Cause (Occurance) | ID Under size One Pipe mix With Ok Regular Raw Material. |
Root Cause Analysis (Outflow)
Why 1 | D UNDERSIZE-ID U/S |
Why 2 | ID Under size One Pipe mix With Ok Regular Raw Material. |
Why 3 | The operator on the Traub machine did not check the first parting piece after loading a new pipe. |
Why 4 | Operator Not aware for ID under size. In Regular Operation. |
Why 5 | |
Root Cause (Outflow) | The operator on the Traub machine did not check the first parting piece after loading a new pipe. |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|---|---|---|---|---|
Occurance | Work Instructions Display on Traub Machine for Operator Awareness | Production Incharge | 08/11/2024 | 07/11/2024 | Completed |
Outflow | Plug Gauge Provide On Traub Machine for check the first parting piece after loading a new pipe. | Quality Head | 17/11/2024 | 16/11/2024 | Completed |
9. Inspection Method After Customer Complaint
Change In Inspection System | Yes |
Change Details | Plug Gauge Provide On Traub Machine for check the first parting piece after loading each and Every a New Pipe |
Inspection Method | Gauge |
Other Inspection Method | |
Check Point at Final Inspection | Yes |
Checking Freq. | Sampling |
Sampling | No |
Sample Size | 20Pcs |
10. Evidance of Countermeasure
Occurance (Before) |
ID Under size One Pipe mix With Ok Regular Raw Material. 1196_Occurance_Before.docx |
Occurance (After) |
Work Instructions Display on Traub Machine for Operator Awareness. 1196_Occurance_After.docx |
Outflow (Before) |
The operator on the Traub machine did not check the first parting piece after loading a new pipe. 1196_Outflow_Before.docx |
Outflow (After) |
lug Gauge Provide On Traub Machine for check the first parting piece after loading a new pipe. 1196_Outflow_After.xlsx |
11. Horizontal Deployment
Horizontal Deployment Required | Yes |
Applicable Machine / Model / Plant | All Tube Rings |
12. Document Review
Documents | ControlPlan, PFMEA, WISOP |
Specify Other Document | No |
13. Effectiveness Of Action
Reviewed Quantity | |
Reason for submission |