QFR No - 8000899031
Defect Details
NC No. 8000899031
NC Date 13/11/2024
NC Submission Date
Part No. 550DZ04702
Part Name FORK BOLT -UG4.5
Supplier Name & Code 100106-SHARP ENGINEERS.
ETL Plant 1117-ETL K-228/9 Suspension
Defect Details NOT AS PER SPECIFICATION-GROOVE IN TAPER
 
1. Problem Description
Defect Description GROOVE IN TAPER
Detection Stage Inprocess
Problem Severity Fitment
NG Quantity 43
Is Defect Repeatative? No
Defect Sketch / Photo rzw5ghcoxsffxzljwcj3whye.jpg
Supplier Communication Details
Quality Head Email ID quality@apw3.co.in
Plant Head/CEO Email ID kurund.ma@sharp-engineers.com
MD Email ID urkhandelwal@sharp-engineers.com
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
1000
0
0
500
2000
3500
Check Qty
1000
0
0
500
2000
3500
NG Qty
43
0
0
200
0
243
 
Scrap 0
Rework 243
Under Deviation 0
Containment Action
Segregation done immediately for existing pipeline material.
 
3. Process Flow
Process Flow Description
10) RM Inward 20) Cold forge (outsource) 30) Inward Inspection 40) CNC 1st machining 50) Threading 60) Plating (Outsource) 70) Inward Inspection 80) Final Inspection 90) Pre-dispatch Inspection 100) Packing & Forwarding
 
4. Process Details
Process / Operation CNC Machining
Outsource No
Machine / Cell Machine Shop
Machine / Cell No. SE/CNC/05
5. Problem Analysis
-------
Type Possible Cause Fact Verification Jud
 
6. Inspection Method Analysis (Current)
Inspection Method
Other Inspection Method
Check Point at Final Inspection
Checking Freq.
Sampling
Sample Size
7. Root Cause Analysis (Occurance)
Why 1
Why 2
Why 3
Why 4
Why 5
Root Cause (Occurance)
 
Root Cause Analysis (Outflow)
Why 1
Why 2
Why 3
Why 4
Why 5
Root Cause (Outflow)
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
-------
Type Countermeasure Details Responsibility Target Date Actual Date Status
 
9. Inspection Method After Customer Complaint
Change In Inspection System
Change Details
Inspection Method
Other Inspection Method
Check Point at Final Inspection
Checking Freq.
Sampling
Sample Size
10. Evidance of Countermeasure
Occurance (Before)
Occurance (After)
Outflow (Before)
Outflow (After)
 
11. Horizontal Deployment
Horizontal Deployment Required
Applicable Machine / Model / Plant
 
12. Document Review
Documents
Specify Other Document
 
13. Effectiveness Of Action
Reviewed Quantity
Reason for submission