QFR No - 8000899031
Defect Details
NC No. | 8000899031 |
NC Date | 13/11/2024 |
NC Submission Date | |
Part No. | 550DZ04702 |
Part Name | FORK BOLT -UG4.5 |
Supplier Name & Code | 100106-SHARP ENGINEERS. |
ETL Plant | 1117-ETL K-228/9 Suspension |
Defect Details | NOT AS PER SPECIFICATION-GROOVE IN TAPER |
1. Problem Description
Defect Description | GROOVE IN TAPER |
Detection Stage | Inprocess |
Problem Severity | Fitment |
NG Quantity | 43 |
Is Defect Repeatative? | No |
Defect Sketch / Photo | rzw5ghcoxsffxzljwcj3whye.jpg |
Supplier Communication Details
Quality Head Email ID | quality@apw3.co.in |
Plant Head/CEO Email ID | kurund.ma@sharp-engineers.com |
MD Email ID | urkhandelwal@sharp-engineers.com |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
1000
|
0
|
0
|
500
|
2000
|
3500
|
Check Qty |
1000
|
0
|
0
|
500
|
2000
|
3500
|
NG Qty |
43
|
0
|
0
|
200
|
0
|
243
|
Scrap | 0 |
Rework | 243 |
Under Deviation | 0 |
Containment Action |
---|
Segregation done immediately for existing pipeline material. |
3. Process Flow
Process Flow Description |
---|
10) RM Inward 20) Cold forge (outsource) 30) Inward Inspection 40) CNC 1st machining 50) Threading 60) Plating (Outsource) 70) Inward Inspection 80) Final Inspection 90) Pre-dispatch Inspection 100) Packing & Forwarding |
4. Process Details
Process / Operation | CNC Machining |
Outsource | No |
Machine / Cell | Machine Shop |
Machine / Cell No. | SE/CNC/05 |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|
6. Inspection Method Analysis (Current)
Inspection Method | |
Other Inspection Method | |
Check Point at Final Inspection | |
Checking Freq. | |
Sampling | |
Sample Size |
7. Root Cause Analysis (Occurance)
Why 1 | |
Why 2 | |
Why 3 | |
Why 4 | |
Why 5 | |
Root Cause (Occurance) |
Root Cause Analysis (Outflow)
Why 1 | |
Why 2 | |
Why 3 | |
Why 4 | |
Why 5 | |
Root Cause (Outflow) |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|
9. Inspection Method After Customer Complaint
Change In Inspection System | |
Change Details | |
Inspection Method | |
Other Inspection Method | |
Check Point at Final Inspection | |
Checking Freq. | |
Sampling | |
Sample Size |
10. Evidance of Countermeasure
Occurance (Before) |
|
Occurance (After) |
|
Outflow (Before) |
|
Outflow (After) |
|
11. Horizontal Deployment
Horizontal Deployment Required | |
Applicable Machine / Model / Plant |
12. Document Review
Documents | |
Specify Other Document |
13. Effectiveness Of Action
Reviewed Quantity | |
Reason for submission |