QFR No - 7000923677
Defect Details
NC No. | 7000923677 |
NC Date | 21/06/2023 |
NC Submission Date | |
Part No. | S2DP02902B |
Part Name | EXTENSION K55G |
Supplier Name & Code | 100106-SHARP ENGINEERS. |
ETL Plant | 1136-ETL Suspension Sanand |
Defect Details | RUSTY-Rusty |
1. Problem Description
Defect Description | Material rusty |
Detection Stage | Receipt |
Problem Severity | Aesthetic |
NG Quantity | 1090 |
Is Defect Repeatative? | No |
Defect Sketch / Photo |
Supplier Communication Details
Quality Head Email ID | quality@apw3.co.in |
Plant Head/CEO Email ID | kurund.ma@sharp-engineers.com |
MD Email ID | urkhandelwal@sharp-engineers.com |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
5000
|
5000
|
0
|
1000
|
0
|
11000
|
Check Qty |
5000
|
5000
|
0
|
1000
|
0
|
11000
|
NG Qty |
1090
|
0
|
0
|
0
|
0
|
1090
|
Scrap | 0 |
Rework | 1060 |
Under Deviation | 0 |
Containment Action |
---|
Segregation done at WIP and FG and defective part removed from ok part. |
3. Process Flow
Process Flow Description |
---|
10) RM Inward 20) Storage 30) Material Issue 40) Parting & Drilling 50) ID Chamfer 60) Tapping 70) OD grinding 80) Final Inspection 90) Pre-dispatch inspection100) Packing & dispatch |
4. Process Details
Process / Operation | Storage (Warehouse) |
Outsource | Yes |
Machine / Cell | NA |
Machine / Cell No. | NA |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|---|---|---|
Machine | Improper preventive maintenance | Preventive maintenance plan evident as per P/MNT/01 and being followed as per F/MNT/07 | O |
Method | Material Handling( Material should be store on the pallet at warehouse) | Material kept on ground floor instead of pallet. | X |
Tool | Insert/Tool/Drill worn out | Tool life monitoring as per defined tool life monitoring. | O |
Material | Incorrect Raw Material | Material observed as per customer requirement Ø16.10 EN1A , MTC verified as per drawing specificatio | O |
Man | Un-skilled Operator | Stage wise skill matrix and operator license are evident as per F/HR/06 | O |
6. Inspection Method Analysis (Current)
Inspection Method | Other |
Other Inspection Method | Warehouse storage |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | Bag to Bag |
7. Root Cause Analysis (Occurance)
Why 1 | Extension K55 Rusty |
Why 2 | Material storage on the ground floor |
Why 3 | Pallet not available. |
Why 4 | Improper material storage by old transporter (Mumbai-Gujrat transport) |
Why 5 | |
Root Cause (Occurance) | Material storage on the ground floor, Pallet not available. (Mumbai-Gujrat transport) |
Root Cause Analysis (Outflow)
Why 1 | Extension K55 Rusty part reached to ETL |
Why 2 | RP oil dried after 20 days of oil application |
Why 3 | Rust preventive oil PANOL RP DW 68 being used |
Why 4 | Defined by system. |
Why 5 | |
Root Cause (Outflow) | Rust preventive oil PANOL RP DW 68 being used, less life of rust preventive oil(Only 15 days after oil application) |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|---|---|---|---|---|
Outflow | Rust preventive oil VORSTAB is being used, excess life of rust preventive oil. (@1 month) | Mr. Shaikh L.N. | 04/07/2023 | 04/07/2023 | Completed |
Occurance | Proper storage identified at warehouse material and provided pallet for storage | Mr. Shaikh L.N. | 04/07/2023 | 04/07/2023 | Completed |
9. Inspection Method After Customer Complaint
Change In Inspection System | Yes |
Change Details | RP oil has been changed |
Inspection Method | Other |
Other Inspection Method | Visually |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | 1:1 |
10. Evidance of Countermeasure
Occurance (Before) |
Material storage on the ground floor, Pallet not available. (Mumbai-Gujrat transport) 490_Occurance_Before.pptx |
Occurance (After) |
Pallet made available. (Anjali logistic ) 490_Occurance_After.pptx |
Outflow (Before) |
Rust preventive oil PANOL RP DW 68 being used, less life of rust preventive oil(Only 15 days after oil application) 490_Outflow_Before.pptx |
Outflow (After) |
Rust preventive oil VORSTAB is being used, excess life of rust preventive oil. (@1 month) 490_Outflow_After.pptx |
11. Horizontal Deployment
Horizontal Deployment Required | Yes |
Applicable Machine / Model / Plant | NA |
12. Document Review
Documents | ControlPlan, PFMEA, WISOP, InspCheckSheet |
Specify Other Document | NA |
13. Effectiveness Of Action
Reviewed Quantity | 1 |
Reason for submission | No rust observed in fresh lots. |