Defect Details
NC No. 7001014527
NC Date 16/05/2024
NC Submission Date
Part No. F2PH00902B
Part Name VALVE RETAINER (C101B)
Supplier Name & Code 100106-SHARP ENGINEERS.
ETL Plant 1136-ETL Suspension Sanand
Defect Details THICKNESS UNDERSIZE-Total Width undersize
 
1. Problem Description
Defect Description Total width specified 9.30 mm found undersize 8.69 mm (NG).
Detection Stage Inprocess
Problem Severity Fitment
NG Quantity 4047
Is Defect Repeatative? No
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID quality@apw3.co.in
Plant Head/CEO Email ID kurund.ma@sharp-engineers.com
MD Email ID urkhandelwal@sharp-engineers.com
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
70000
20000
6000
20000
10000
126000
Check Qty
70000
20000
6000
20000
10000
126000
NG Qty
14047
0
0
0
0
14047
 
Scrap 14047
Rework 0
Under Deviation 0
Containment Action
Segregation done at ETL Material and suspected material recalled for checking purpose.
 
3. Process Flow
Process Flow Description
10) RM Inward 20) Parting 30) CNC 1st set up 40) OD grinding 50) Plating Process 60) Inward Inspection 70) Final Inspection 80) 90) Pre-dispatch Inspection10) Packing & Farwarding
 
4. Process Details
Process / Operation CNC Process
Outsource No
Machine / Cell Machine Shop
Machine / Cell No. SE/CNC/05
5. Problem Analysis
Type Possible Cause Fact Verification Jud
MachineMachine variation & inaccurate machineJH/PM plan and execution being done as per requirementO
MethodWrong inspection medthodInspection similar for length checking by height checking gauge.O
ToolTool/Insert worn outTool life monitoring as per defined frequency monitoring.O
ManUnskilled manpowerUnskilled manpower at final inspection stageX
MaterialWrong material grade usedRM testing plan and execution as per plan available.O
 
6. Inspection Method Analysis (Current)
Inspection Method Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 1:1
7. Root Cause Analysis (Occurance)
Why 1 Dimension 9.30 u/s by 0.5mm
Why 2 NG part mix up with ok part
Why 3 NG material and OK material stored together.
Why 4 Lack of storage
Why 5 Construction on going for plant expansion.
Root Cause (Occurance) NG material and OK material stored together.
 
Root Cause Analysis (Outflow)
Why 1 DIM 9.30 under size part reached to ETL
Why 2 Sampling Basis Inspection as per sampling plan IS:2500
Why 3 No 100% inspection done at FID stage
Why 4 Inspection frequency define by system at PPAP stage
Why 5
Root Cause (Outflow) Sampling Basis Inspection as per sampling plan IS:2500. No 100% inspection done at FID stage
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OccuranceRed bins provided for NG material at final inspection and machining stage with key locking to avoid mix up issues.Mr. Shaikh L.N.31/05/202431/05/2024Completed
OutflowSampling Basis Inspection as per sampling plan IS:2500 changed into 100% inspection at FID stage. Gauge provided for height checking.Mr. Shaikh L.N.31/05/202431/05/2024Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System Yes
Change Details 100% inspection at FID stage.
Inspection Method Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 1:1
10. Evidance of Countermeasure
Occurance (Before) NG material kept openly in the open bin
804_Occurance_Before.pptx
Occurance (After) Red bins provided for NG material at final inspection and machining stage with key locking to avoid mix up issues.
804_Occurance_After.pptx
Outflow (Before) Sampling Basis Inspection as per sampling plan IS:2500. No 100% inspection done at FID stage
804_Outflow_Before.jpg
Outflow (After) Sampling Basis Inspection as per sampling plan IS:2500 changed into 100% inspection at FID stage. Gauge provided for height checking.
804_Outflow_After.jpg
 
11. Horizontal Deployment
Horizontal Deployment Required No
Applicable Machine / Model / Plant NA
 
12. Document Review
Documents ControlPlan, PFMEA, WISOP, InspCheckSheet
Specify Other Document NA
 
13. Effectiveness Of Action
Reviewed Quantity 5
Reason for submission Total width specified 9.30 mm found undersize 8.69 mm after action taken at supplier end lot found Ok