QFR No - 8000785257
Defect Details
NC No. 8000785257
NC Date 25/04/2022
NC Submission Date
Part No. S2HS21103B
Part Name OUTER TUBE PLATED K3 NEW
Supplier Name & Code 101273-SAPTAGIRI ENGINEERING PRIVATE
ETL Plant 1118-ETL E-92,93 Suspension
Defect Details PLATING NOT OK-PLATING PEEL OFF
 
1. Problem Description
Defect Description Outer Tube K3 Model Plating peel off issue
Detection Stage Inprocess
Problem Severity Aesthetic
NG Quantity 177
Is Defect Repeatative? No
Defect Sketch / Photo nda0pbc12ahfych2ukeoeucg.png
Supplier Communication Details
Quality Head Email ID quality@saptagirigroup.in
Plant Head/CEO Email ID production@saptagirigroup.in
MD Email ID
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
5000
0
0
2545
0
7545
Check Qty
5000
0
0
2545
0
7545
NG Qty
1089
0
0
3
0
1092
 
Scrap 3
Rework 0
Under Deviation 0
Containment Action
We have checked available stock at ETL end
 
3. Process Flow
Process Flow Description
Raw Material Inward (CEW Tube),Tube Cutting & O.D. Chamfering, Both side I.D. Chamfering ,Forming,CNC Machining,Marking,Buffing,Plating,100% Thread Inspection
 
4. Process Details
Process / Operation Plating
Outsource No
Machine / Cell Plating
Machine / Cell No. Line-1
5. Problem Analysis
Type Possible Cause Fact Verification Jud
MethodMaintain pH of water rinse bath before nickel platingLow pH of water rinse bath before nickel platingO
 
6. Inspection Method Analysis (Current)
Inspection Method Other
Other Inspection Method Bend test
Check Point at Final Inspection Yes
Checking Freq. Sampling
Sampling No
Sample Size 4
7. Root Cause Analysis (Occurance)
Why 1 peel off in outer tube
Why 2 Outer tube passivate in water rinse after acid dip
Why 3 Low pH of water rinse bath before nickel plating
Why 4 Carryover of acid dip solution to next water rinse
Why 5 Higher concentration of acid dip bath resulted into higher concentrated solution of next bath (i.e. water rinse
Root Cause (Occurance) Component get passivate due to dipped in High concentrated water rinse bath which is after acid dip.
 
Root Cause Analysis (Outflow)
Why 1 peel off in outer tube
Why 2 Bend test checking sampling plan less
Why 3 During bend test not detect
Why 4
Why 5
Root Cause (Outflow) During bend test not detect
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OutflowOne sample was tested for bend test now we have started 4 nos sample bend test per day.QA20/04/202220/04/2022Completed
OccuranceWeekly PM of water rinse bath (Stage no. 17) changed to thrice in a week (i.e. on second day of running condition)QA / Production19/04/202220/04/2022Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System Yes
Change Details 100% file test monitoring to be done for plated Outer Tube.
Inspection Method Other
Other Inspection Method Sampling increase
Check Point at Final Inspection Yes
Checking Freq. Sampling
Sampling No
Sample Size 4 per day
10. Evidance of Countermeasure
Occurance (Before) Weekly PM of water rinse bath (Stage no. 17)
66_Occurance_Before.pptx
Occurance (After) PM of water rinse bath (Stage no. 17) changed to thrice in a week (i.e. on second day of running condition)
66_Occurance_After.pdf
Outflow (Before) One sample was tested for bend test
66_Outflow_Before.pdf
Outflow (After) now we have started 4 nos sample bend test per day.
66_Outflow_After.pptx
 
11. Horizontal Deployment
Horizontal Deployment Required Yes
Applicable Machine / Model / Plant All Plated outer tube
 
12. Document Review
Documents ControlPlan, PMCheckSheet, WISOP
Specify Other Document No
 
13. Effectiveness Of Action
Reviewed Quantity 2000
Reason for submission Plating peel off on Outer Tube