QFR No - 8000833174
Defect Details
NC No. | 8000833174 |
NC Date | 17/06/2023 |
NC Submission Date | |
Part No. | B2SG00426O |
Part Name | CBS ACTUATING LINK |
Supplier Name & Code | 100144-AURANGABAD PRESSINGS |
ETL Plant | 1156-ETL Disc Brake P'Nagar |
Defect Details | PATCH MARK ON SPOT FACE.-PLATING MISS |
1. Problem Description
Defect Description | Plating miss |
Detection Stage | Inprocess |
Problem Severity | Aesthetic |
NG Quantity | 50 |
Is Defect Repeatative? | Yes |
Defect Sketch / Photo |
Supplier Communication Details
Quality Head Email ID | quality@apw3.co.in |
Plant Head/CEO Email ID | aurangabadpressings@apw3.co.in |
MD Email ID | shashikant@apw3.co.in |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
4500
|
0
|
0
|
0
|
0
|
4500
|
Check Qty |
4500
|
0
|
0
|
0
|
0
|
4500
|
NG Qty |
647
|
0
|
0
|
0
|
0
|
647
|
Scrap | 50 |
Rework | 0 |
Under Deviation | 597 |
Containment Action |
---|
Sagration |
3. Process Flow
Process Flow Description |
---|
Blanking /piercing/1st forming/forming/drilling/plating |
4. Process Details
Process / Operation | Plating |
Outsource | Yes |
Machine / Cell | Plating Shop |
Machine / Cell No. | 01 |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|---|---|---|
Method | Passivation time | Time increased | O |
6. Inspection Method Analysis (Current)
Inspection Method | Other |
Other Inspection Method | Visual inspection |
Check Point at Final Inspection | No |
Checking Freq. | 100% |
Sampling | No |
Sample Size | 100% |
7. Root Cause Analysis (Occurance)
Why 1 | Passivation time less |
Why 2 | operator awarness |
Why 3 | need Training |
Why 4 | |
Why 5 | |
Root Cause (Occurance) | 1 |
Root Cause Analysis (Outflow)
Why 1 | Need Training to operator |
Why 2 | awarness about component |
Why 3 | |
Why 4 | |
Why 5 | |
Root Cause (Outflow) | Less passivation time |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|---|---|---|---|---|
Outflow | Passivation time less | Operator | 27/06/2023 | Pending |
9. Inspection Method After Customer Complaint
Change In Inspection System | Yes |
Change Details | 100% visual inspection |
Inspection Method | Other |
Other Inspection Method | Visual inspection |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | 100% |
10. Evidance of Countermeasure
Occurance (Before) |
one 483_Occurance_Before.pdf |
Occurance (After) |
no 483_Occurance_After.pdf |
Outflow (Before) |
one 483_Outflow_Before.pdf |
Outflow (After) |
one 483_Outflow_After.pdf |
11. Horizontal Deployment
Horizontal Deployment Required | Yes |
Applicable Machine / Model / Plant | All Plating component |
12. Document Review
Documents | WISOP, InspCheckSheet |
Specify Other Document | PDI Report |
13. Effectiveness Of Action
Reviewed Quantity | |
Reason for submission |