QFR No - 8000846809
Defect Details
NC No. 8000846809
NC Date 29/09/2023
NC Submission Date
Part No. B2FP05213O
Part Name HOLDER BRACKET FINISHED-RE J1 FRONT
Supplier Name & Code 201092-PRANEEL INDUSTRIES
ETL Plant 1120-ETL K-226/2 Disc Brakes
Defect Details NOT AS PER SPECIFICATION-PART REJECTED AFTER 100% INSPECTION AT E
 
1. Problem Description
Defect Description Powder coating not ok
Detection Stage Receipt
Problem Severity Aesthetic
NG Quantity 8
Is Defect Repeatative? Yes
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID quality@praneelgroup.com
Plant Head/CEO Email ID praneelindustries@rediiffmail.com
MD Email ID anilpatil@praneelgroup.com
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
260
0
0
80
0
340
Check Qty
260
0
0
80
0
340
NG Qty
8
0
0
5
0
13
 
Scrap 13
Rework 0
Under Deviation 0
Containment Action
All WIP checked at all end . Defective parts rejected.
 
3. Process Flow
Process Flow Description
Powder Coating Process ( Outsourcing at Krishna Coating )
 
4. Process Details
Process / Operation Powder coating
Outsource Yes
Machine / Cell VMC Cell
Machine / Cell No. 01
5. Problem Analysis
Type Possible Cause Fact Verification Jud
ManNo awareness to operatorNew operatorX
MethodWrong method of poweder coatingverified, found okO
ToolVentury DamagedVerified , ventury found damagedX
MachineLow air pressureVerified , air pressure found okO
MaterialWrong material usedVerified , Material as per specificationsO
 
6. Inspection Method Analysis (Current)
Inspection Method Other
Other Inspection Method Visual
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100%
7. Root Cause Analysis (Occurance)
Why 1 Uncover issue observed in Holder bracket
Why 2 Defective ventury observed in Powder coating Gun
Why 3 Powder coating Gun not proper checked before powder coating process
Why 4 Powder coating Operator has not gained sufficient knowledge for powder coating process
Why 5
Root Cause (Occurance) New Manpower
 
Root Cause Analysis (Outflow)
Why 1 Skipped from final inspection
Why 2 New Manpower
Why 3 Old manpower unplanned absenteeism
Why 4
Why 5
Root Cause (Outflow) Old manpower unplanned absenteeism
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OccuranceImmediate new ventury install in Powder coating GunMr.Tosif16/10/202316/10/2023Completed
OccurancePM check Sheet provided at Powder coating booth for coating gun checking and CleaningMr.Tosif25/10/202325/10/2023Completed
OutflowTraining provided to Powder coating operator for powder coating gun checking and CleaningMr. Tosif16/10/202316/10/2023Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System No
Change Details No changes
Inspection Method Other
Other Inspection Method Visual
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100%
10. Evidance of Countermeasure
Occurance (Before) No checkpoint in PM Checksheet
559_Occurance_Before.pptx
Occurance (After) Checkpoint added in PM checksheet
559_Occurance_After.jpg
Outflow (Before) Skipped from final inspection
559_Outflow_Before.jpg
Outflow (After) Training & awareness given to final inspector
559_Outflow_After.jpg
 
11. Horizontal Deployment
Horizontal Deployment Required Yes
Applicable Machine / Model / Plant All Holder Brackets for Praneel Industries
 
12. Document Review
Documents PMCheckSheet, InspCheckSheet
Specify Other Document Q-Alert
 
13. Effectiveness Of Action
Reviewed Quantity 50
Reason for submission No defect found in latest lot