QFR No - 8000846809
Defect Details
NC No. | 8000846809 |
NC Date | 29/09/2023 |
NC Submission Date | |
Part No. | B2FP05213O |
Part Name | HOLDER BRACKET FINISHED-RE J1 FRONT |
Supplier Name & Code | 201092-PRANEEL INDUSTRIES |
ETL Plant | 1120-ETL K-226/2 Disc Brakes |
Defect Details | NOT AS PER SPECIFICATION-PART REJECTED AFTER 100% INSPECTION AT E |
1. Problem Description
Defect Description | Powder coating not ok |
Detection Stage | Receipt |
Problem Severity | Aesthetic |
NG Quantity | 8 |
Is Defect Repeatative? | Yes |
Defect Sketch / Photo |
Supplier Communication Details
Quality Head Email ID | quality@praneelgroup.com |
Plant Head/CEO Email ID | praneelindustries@rediiffmail.com |
MD Email ID | anilpatil@praneelgroup.com |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
260
|
0
|
0
|
80
|
0
|
340
|
Check Qty |
260
|
0
|
0
|
80
|
0
|
340
|
NG Qty |
8
|
0
|
0
|
5
|
0
|
13
|
Scrap | 13 |
Rework | 0 |
Under Deviation | 0 |
Containment Action |
---|
All WIP checked at all end . Defective parts rejected. |
3. Process Flow
Process Flow Description |
---|
Powder Coating Process ( Outsourcing at Krishna Coating ) |
4. Process Details
Process / Operation | Powder coating |
Outsource | Yes |
Machine / Cell | VMC Cell |
Machine / Cell No. | 01 |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|---|---|---|
Man | No awareness to operator | New operator | X |
Method | Wrong method of poweder coating | verified, found ok | O |
Tool | Ventury Damaged | Verified , ventury found damaged | X |
Machine | Low air pressure | Verified , air pressure found ok | O |
Material | Wrong material used | Verified , Material as per specifications | O |
6. Inspection Method Analysis (Current)
Inspection Method | Other |
Other Inspection Method | Visual |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | 100% |
7. Root Cause Analysis (Occurance)
Why 1 | Uncover issue observed in Holder bracket |
Why 2 | Defective ventury observed in Powder coating Gun |
Why 3 | Powder coating Gun not proper checked before powder coating process |
Why 4 | Powder coating Operator has not gained sufficient knowledge for powder coating process |
Why 5 | |
Root Cause (Occurance) | New Manpower |
Root Cause Analysis (Outflow)
Why 1 | Skipped from final inspection |
Why 2 | New Manpower |
Why 3 | Old manpower unplanned absenteeism |
Why 4 | |
Why 5 | |
Root Cause (Outflow) | Old manpower unplanned absenteeism |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|---|---|---|---|---|
Occurance | Immediate new ventury install in Powder coating Gun | Mr.Tosif | 16/10/2023 | 16/10/2023 | Completed |
Occurance | PM check Sheet provided at Powder coating booth for coating gun checking and Cleaning | Mr.Tosif | 25/10/2023 | 25/10/2023 | Completed |
Outflow | Training provided to Powder coating operator for powder coating gun checking and Cleaning | Mr. Tosif | 16/10/2023 | 16/10/2023 | Completed |
9. Inspection Method After Customer Complaint
Change In Inspection System | No |
Change Details | No changes |
Inspection Method | Other |
Other Inspection Method | Visual |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | 100% |
10. Evidance of Countermeasure
Occurance (Before) |
No checkpoint in PM Checksheet 559_Occurance_Before.pptx |
Occurance (After) |
Checkpoint added in PM checksheet 559_Occurance_After.jpg |
Outflow (Before) |
Skipped from final inspection 559_Outflow_Before.jpg |
Outflow (After) |
Training & awareness given to final inspector 559_Outflow_After.jpg |
11. Horizontal Deployment
Horizontal Deployment Required | Yes |
Applicable Machine / Model / Plant | All Holder Brackets for Praneel Industries |
12. Document Review
Documents | PMCheckSheet, InspCheckSheet |
Specify Other Document | Q-Alert |
13. Effectiveness Of Action
Reviewed Quantity | 50 |
Reason for submission | No defect found in latest lot |