QFR No - 8000886662
Defect Details
NC No. 8000886662
NC Date 12/08/2024
NC Submission Date
Part No. F2GA02302B
Part Name PROTECTION COVER-XF1D1-XF1C1
Supplier Name & Code 100990-JAIRAJ ANCILLARIES PVT LTD
ETL Plant 1117-ETL K-228/9 Suspension
Defect Details NOT AS PER SPECIFICATION-DUST MARK
 
1. Problem Description
Defect Description Dust Mark
Detection Stage Customer End
Problem Severity Aesthetic
NG Quantity 694
Is Defect Repeatative? No
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID planthead.aurangabad@jairajgroup.com
Plant Head/CEO Email ID vp@jairajgroup.com
MD Email ID rajiv@jairajgroup.com
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
14000
0
0
1000
0
15000
Check Qty
14000
0
0
1000
0
15000
NG Qty
694
0
0
35
0
729
 
Scrap 729
Rework 0
Under Deviation 0
Containment Action
100 % inspection at final & firewall workstation with identification mark on it .
 
3. Process Flow
Process Flow Description
Injection Moulding
 
4. Process Details
Process / Operation Injection Moulding
Outsource No
Machine / Cell IM-04
Machine / Cell No. IM-4
5. Problem Analysis
Type Possible Cause Fact Verification Jud
MachineBarrel Temp High / Lowverified as per Cp & OCS found ok , As per Standard SpecificationO
ToolAir trapped & air vent inefficient openverifie Air vent blocked due to carbon deposit on air vent surfaceX
ManMan Power does not aware about this defect .verifed that operator , In process inspector & Final Inspector does not about this defect .X
MaterialRM Grade not as per CP .Check with MTC & found ok as per specificationO
MethodSampling Inspectionverified & Found that Defect are checked on sampling basis At FIX
MachineOPS & control plan not followed by Machine Operator .verified as per CP & OCS found ok , As per standard specificiationO
MethodRM preheating not doneVerified as per CP & OCS found ok , As per Standard SpecificationO
 
6. Inspection Method Analysis (Current)
Inspection Method Other
Other Inspection Method Visually
Check Point at Final Inspection Yes
Checking Freq. Sampling
Sampling No
Sample Size 5
7. Root Cause Analysis (Occurance)
Why 1 Dust marks due to air trapped in tool erratically while injection .
Why 2 Air vent blocked due to carbon deposit formed on air vent surface
Why 3 Carbon deposit formed due to un periodic cleaning during production
Why 4 Air vent cleaning done during Production is not effective .
Why 5
Root Cause (Occurance) .Air vent cleaning done during Production is not effective .
 
Root Cause Analysis (Outflow)
Why 1 Dust mark observed on part surface .
Why 2 Defective part skipped from operator & final Inspector .
Why 3 Lack of Awareness of Highlighted defect .
Why 4
Why 5
Root Cause (Outflow) Lack of Awareness of Highlighted defect .
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OccuranceAir vent cleaning increased from 25 pieces to 15 pieces .Sandeep Roday17/08/202402/09/2024Completed
OutflowAwareness training given to in process inspector & Final Inspector about highlighted defect .Sandeep Roday19/08/202402/09/2024Completed
OccuranceAir vent cleaning done by Chemical WD -40 .Ganesh Mahske16/08/202402/09/2024Completed
OutflowCheck Point Added in PM sheet & CP & FMEA updated for the sameSandeep Roday21/08/202402/09/2024Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System Yes
Change Details 100% Visual Inspection at final stage for Dust Mark
Inspection Method Other
Other Inspection Method Visual
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100 %
10. Evidance of Countermeasure
Occurance (Before) Air Vent cleaning not By chemical in mould pm check sheet .
1018_Occurance_Before.xlsx
Occurance (After) PM check Sheet After correction .
1018_Occurance_After.pdf
Outflow (Before) Dust Mark check point not address in inspection standard .
1018_Outflow_Before.pdf
Outflow (After) Dust mark check point add in inspection standard .
1018_Outflow_After.pdf
 
11. Horizontal Deployment
Horizontal Deployment Required No
Applicable Machine / Model / Plant NO
 
12. Document Review
Documents PMCheckSheet, WISOP, InspCheckSheet
Specify Other Document Q alert .
 
13. Effectiveness Of Action
Reviewed Quantity 50
Reason for submission ok