NC No. | 7000951326 |
NC Date | 09/10/2023 |
NC Submission Date | |
Part No. | F2HL00402B |
Part Name | OIL LOCK COLLAR (HMC-31/K38G) |
Supplier Name & Code | 100106-SHARP ENGINEERS. |
ETL Plant | 1136-ETL Suspension Sanand |
Defect Details | MIX UP OTHER MODEL-Wrong part |
1. Problem Description
Defect Description | Other model mixing parts found in oil lock collar |
Detection Stage | Receipt |
Problem Severity | Fitment |
NG Quantity | 123 |
Is Defect Repeatative? | Yes |
Defect Sketch / Photo | ekltmoemj1irgygxc21udo1u.jpg |
Supplier Communication Details
Quality Head Email ID | quality@apw3.co.in |
Plant Head/CEO Email ID | kurund.ma@sharp-engineers.com |
MD Email ID | urkhandelwal@sharp-engineers.com |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
6000
|
5000
|
5000
|
10000
|
5000
|
31000
|
Check Qty |
6000
|
5000
|
5000
|
10000
|
5000
|
31000
|
NG Qty |
123
|
0
|
0
|
0
|
0
|
123
|
Scrap | 0 |
Rework | 123 |
Under Deviation | 0 |
Containment Action |
---|
All the suspected material has been cross checked and dispatched. |
3. Process Flow
Process Flow Description |
---|
10) RM Inward 20) RM Storage 30) Parting & Chamfering 40) ID Chamfering 50) OD grinding 60) Plating (Outsource) 70) 80) Inward Inspection 90) Final Inspection 100) Packing & Dispatch |
4. Process Details
Process / Operation | Packing |
Outsource | No |
Machine / Cell | Final Inspection |
Machine / Cell No. | Q Gate |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|---|---|---|
Method | Operator Working Method Wrong | SOP/WI available on machine and operator aware about it and being followed. | O |
Man | Un-skilled Operator | Stage wise skill matrix and operator license are not evident as per F/HR/06 | X |
Material | Incorrect RM grade | Third part inspection verified for chemical composition and hardness testing as per requirement. | O |
Tool | Tool life monitoring inadequate | Tool life for all the tool i.e. forming tool, drill, and insert are defined and recorded as per freq | O |
Machine | Improper preventive maintenance | Preventive maintenance plan evident as per P/MNT/01 and being followed as per F/MNT/07 | O |
6. Inspection Method Analysis (Current)
Inspection Method | Other |
Other Inspection Method | Visual |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | Bag To Bag |
7. Root Cause Analysis (Occurance)
Why 1 | Wrong Part reached at ETL |
Why 2 | Two different part kept at same location. |
Why 3 | Packing was same. |
Why 4 | Not detected from outside. |
Why 5 | Transparent poly bag not in used. |
Root Cause (Occurance) | Transparent poly bag not in used at BSR stage. |
Root Cause Analysis (Outflow)
Why 1 | Wrong Part reached at ETL |
Why 2 | Incorrect material selection form BSR while dispatching. |
Why 3 | Person not aware about the part |
Why 4 | SOP & Analysis: Material handling of Finish Product being supplied to Endurance not displayed at BSR. |
Why 5 | |
Root Cause (Outflow) | SOP & Analysis: Material handling of Finish Product being supplied to Endurance not displayed at BSR. |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|---|---|---|---|---|
Occurance | Transparent poly bag are being used at BSR stage. | Mr. Ganesh Mande | 17/10/2023 | 17/10/2023 | Completed |
Outflow | SOP & Analysis: Material handling of Finish Product being supplied to Endurance displayed at BSR. | Mr. Ganesh Mande | 17/10/2023 | 17/10/2023 | Completed |
9. Inspection Method After Customer Complaint
Change In Inspection System | Yes |
Change Details | 100%inspection |
Inspection Method | Other |
Other Inspection Method | Visual Inspection |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | 1:1 |
10. Evidance of Countermeasure
Occurance (Before) |
Transparent poly bag not in used at BSR stage. 573_Occurance_Before.pptx |
Occurance (After) |
Transparent poly bag are being used at BSR stage. 573_Occurance_After.pptx |
Outflow (Before) |
SOP & Analysis: Material handling of Finish Product being supplied to Endurance not displayed at BSR. 573_Outflow_Before.pptx |
Outflow (After) |
SOP & Analysis: Material handling of Finish Product being supplied to Endurance displayed at BSR. 573_Outflow_After.pptx |
11. Horizontal Deployment
Horizontal Deployment Required | No |
Applicable Machine / Model / Plant | NA |
12. Document Review
Documents | PFMEA, WISOP, PackingStd |
Specify Other Document | NA |
13. Effectiveness Of Action
Reviewed Quantity | 5 |
Reason for submission | Wrong model (Mix up other model) |