QFR No - 7000966627
Defect Details
NC No. | 7000966627 |
NC Date | 12/12/2023 |
NC Submission Date | |
Part No. | B20702700O |
Part Name | END CONNECTOR ASM M/CYL & CAL.ST.BR. |
Supplier Name & Code | 101221-SUNREN AUTOMOTIVE PRIVATE LIMI |
ETL Plant | 1120-ETL K-226/2 Disc Brakes |
Defect Details | DAMAGES-damages |
1. Problem Description
Defect Description | DAMAGES-damages |
Detection Stage | Receipt |
Problem Severity | Aesthetic |
NG Quantity | 167 |
Is Defect Repeatative? | Yes |
Defect Sketch / Photo |
Supplier Communication Details
Quality Head Email ID | shivank@sunren.in |
Plant Head/CEO Email ID | shivank@sunren.in |
MD Email ID | subhashsaini@sunren.in |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
0
|
2000
|
3500
|
1500
|
2500
|
9500
|
Check Qty |
0
|
2000
|
3500
|
1500
|
2500
|
9500
|
NG Qty |
0
|
15
|
0
|
10
|
0
|
25
|
Scrap | 0 |
Rework | 25 |
Under Deviation | 0 |
Containment Action |
---|
100% Material Segregation |
3. Process Flow
Process Flow Description |
---|
Forging- Centerless Grinding - Cylinder Drill - CNC1st - CNC2ND- Facing2nd-Neck Drill-Step Drill-Nipple Assy.-Brazing-100%Visual Inspection-Bending-Final Inspection |
4. Process Details
Process / Operation | Facing |
Outsource | No |
Machine / Cell | Facing Machine |
Machine / Cell No. | 8 |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|---|---|---|
Method | Packaging Standard | Yes | O |
6. Inspection Method Analysis (Current)
Inspection Method | Other |
Other Inspection Method | Visual |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | 100% |
7. Root Cause Analysis (Occurance)
Why 1 | Dent & Damages |
Why 2 | Due to small face width. |
Why 3 | Due to drawing |
Why 4 | |
Why 5 | |
Root Cause (Occurance) | Due to small face width. |
Root Cause Analysis (Outflow)
Why 1 | Dent & Damages |
Why 2 | Due to metal to metal contact |
Why 3 | Due to poor handling |
Why 4 | Due to Packaging Standard |
Why 5 | |
Root Cause (Outflow) | Due to packaging standard |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|---|---|---|---|---|
Occurance | Face Width should be increased and same has to be cover in the drawing. | SunRen | 23/12/2023 | 22/12/2023 | Completed |
9. Inspection Method After Customer Complaint
Change In Inspection System | Yes |
Change Details | Additional Checkpoint added. |
Inspection Method | Other |
Other Inspection Method | Visual |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | 05 |
10. Evidance of Countermeasure
Occurance (Before) |
Face Width Diameter is 13.75 615_Occurance_Before.pdf |
Occurance (After) |
Face Width Diameter is 14.97 615_Occurance_After.pdf |
Outflow (Before) |
250 Nos / Polybag 615_Outflow_Before.png |
Outflow (After) |
100 Nos / Polybag 615_Outflow_After.png |
11. Horizontal Deployment
Horizontal Deployment Required | Yes |
Applicable Machine / Model / Plant | B20702500O |
12. Document Review
Documents | Drawing, ControlPlan, WISOP, ProcessFlowChart |
Specify Other Document | ECN |
13. Effectiveness Of Action
Reviewed Quantity | 50 |
Reason for submission | No defect found in latest lot |