QFR No - 7001054564
Defect Details
NC No. 7001054564
NC Date 18/09/2024
NC Submission Date
Part No. 520HN00102
Part Name OIL SEAL
Supplier Name & Code 101062-FREUDENBERG-NOK PRIVATE LIMITE
ETL Plant 1136-ETL Suspension Sanand
Defect Details RUSTY-Rusty material Recieved
 
1. Problem Description
Defect Description Rusty Found in oil seal K0LA (Insert metal) .
Detection Stage Receipt
Problem Severity Function
NG Quantity 10000
Is Defect Repeatative? No
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID Manpreet.Rahi@fst.com
Plant Head/CEO Email ID Vishal.Inge@fst.com
MD Email ID anand.thiagarajan@fst.com
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
82000
112000
0
176000
0
370000
Check Qty
82000
112000
0
176000
0
370000
NG Qty
40000
42000
0
0
0
82000
 
Scrap 42000
Rework 0
Under Deviation 0
Containment Action
100% visual reverification for rust issue & OK identification on label of box
 
3. Process Flow
Process Flow Description
Moulding-->Trimming--Greasing--Inspection & packing
 
4. Process Details
Process / Operation Moulding to FG
Outsource No
Machine / Cell Compression Moulding
Machine / Cell No. Compression Moulding
5. Problem Analysis
Type Possible Cause Fact Verification Jud
MethodPart storage in incorrect packingPart packaging found as per defined packing standardO
MaterialHumidity impact on metal part at storage condition with current packingHumidity observed high due to rainy season & moisture impact on metal part with current polybagX
MethodMetal part kept in open condition at WIP stage (before moulding)Metal part storage observed in closed polybag after treatmentO
MethodPhosphating process skippedbatch production observe din process with tag on each stageO
MaterialRust on input metal partsRust preventive oil seal & phosphating process defined for metal treatmentO
 
6. Inspection Method Analysis (Current)
Inspection Method Other
Other Inspection Method Visually detected
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100%
7. Root Cause Analysis (Occurance)
Why 1 Rust on metal area in oil seal
Why 2 Moisture impacted on open metal area
Why 3 Humidity impacted open metal area in oil seal
Why 4 Current polybag used for oil seal does not have rust prevention controls.
Why 5 Inadequate polybag defined for oil seal packing
Root Cause (Occurance) Current polybag used for oil seal does not have rust prevention controls due to Inadequate polybag defined for oil seal packing
 
Root Cause Analysis (Outflow)
Why 1 Rust on metal area in oil seal not detected @FNI
Why 2 Delayed failure
Why 3
Why 4
Why 5
Root Cause (Outflow) Delayed failure
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OccuranceVCI polybag to be used instead of normal polybagFNI25/10/202410/10/2024Completed
OutflowTraining & education to operatorsFNI18/09/202418/09/2024Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System No
Change Details No change
Inspection Method Other
Other Inspection Method Visual Inspection
Check Point at Final Inspection No
Checking Freq. 100%
Sampling No
Sample Size 100%
10. Evidance of Countermeasure
Occurance (Before) Normal white polybag used
1099_Occurance_Before.png
Occurance (After) VCI polybag instead of normal
1099_Occurance_After.png
Outflow (Before) Rust defect was not updated
1099_Outflow_Before.pdf
Outflow (After) Defect sheet updated with rust defect
1099_Outflow_After.pdf
 
11. Horizontal Deployment
Horizontal Deployment Required No
Applicable Machine / Model / Plant NA
 
12. Document Review
Documents WISOP, PackingStd
Specify Other Document NA
 
13. Effectiveness Of Action
Reviewed Quantity 5
Reason for submission Rusty Found in oil seal K0LA (Insert metal)