QFR No - 8000853852
Defect Details
NC No. | 8000853852 |
NC Date | 05/12/2023 |
NC Submission Date | |
Part No. | F2HL00402B |
Part Name | OIL LOCK COLLAR (HMC-31/K38G) |
Supplier Name & Code | 100106-SHARP ENGINEERS. |
ETL Plant | 1146-ETL Suspension Narasapura |
Defect Details | MIX UP OTHER MODEL-NOT USING K0PG MODEL MIX UP AT SHARP END |
1. Problem Description
Defect Description | Wrong part received not using K0PG Model ( mix up at supplier end) |
Detection Stage | Inprocess |
Problem Severity | Fitment |
NG Quantity | 506 |
Is Defect Repeatative? | No |
Defect Sketch / Photo | qg2jbwcoxguonu5m4n2rmvlw.gif |
Supplier Communication Details
Quality Head Email ID | quality@apw3.co.in |
Plant Head/CEO Email ID | kurund.ma@sharp-engineers.com |
MD Email ID | urkhandelwal@sharp-engineers.com |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
5000
|
0
|
0
|
5000
|
1000
|
11000
|
Check Qty |
5000
|
0
|
0
|
5000
|
1000
|
11000
|
NG Qty |
506
|
0
|
0
|
0
|
0
|
506
|
Scrap | 0 |
Rework | 506 |
Under Deviation | 0 |
Containment Action |
---|
Segregation done at ETL plant and mix up part removed from OK parts. |
3. Process Flow
Process Flow Description |
---|
10) RM Inward 20) RM Storage 30) Parting & Forming 40) Chamfering 50) OD grinding 60) Plating (Outsource) 70) Inward Inspection 80) Final Inspection 90) Pre-dispatch Inspection 100) Packing and forwarding . |
4. Process Details
Process / Operation | Packing and forwarding . |
Outsource | No |
Machine / Cell | NA |
Machine / Cell No. | NA |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|---|---|---|
Man | Un-skilled Operator | Stage wise skill matrix and operator license are evident as per F/HR/06 | O |
Material | Incorrect RM grade | Third part inspection verified for chemical composition and hardness testing as per requirement. | O |
Machine | Inadequate check Point in JH check sheet | Monthly JH check sheet available on machine and all the check point is being checked and recorded as | O |
Method | Packer Working Method Wrong | Kept 2 different type material together | X |
Tool | Tool worn out | Tool life for all the tool i.e. forming tool, drill, tap and insert are defined and recorded as per | O |
6. Inspection Method Analysis (Current)
Inspection Method | Other |
Other Inspection Method | Transparent poly ba |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | 1:1 |
7. Root Cause Analysis (Occurance)
Why 1 | Wrong Part reached at ETL |
Why 2 | Two different part kept at same location. |
Why 3 | Packing was same. |
Why 4 | Not detected from outside. |
Why 5 | Transparent poly bag not in used. |
Root Cause (Occurance) | Transparent poly bag not in used at BSR stage. |
Root Cause Analysis (Outflow)
Why 1 | Wrong Part reached at ETL |
Why 2 | Incorrect material selection form BSR while dispatching. |
Why 3 | Person not aware about the part |
Why 4 | SOP & Analysis: Material handling of Finish Product being supplied to Endurance not displayed at BSR. |
Why 5 | |
Root Cause (Outflow) | SOP & Analysis: Material handling of Finish Product being supplied to Endurance not displayed at BSR. |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|---|---|---|---|---|
Outflow | SOP & Analysis: Material handling of Finish Product being supplied to Endurance displayed at BSR. | Mr. Ganesh Mande | 12/12/2023 | 12/12/2023 | Completed |
Occurance | Transparent poly bag are being used at BSR stage. | Mr. Ganesh Mande | 11/12/2023 | 11/12/2023 | Completed |
9. Inspection Method After Customer Complaint
Change In Inspection System | Yes |
Change Details | 100% inspection before dispatch. |
Inspection Method | Other |
Other Inspection Method | Visually |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | 1:1 |
10. Evidance of Countermeasure
Occurance (Before) |
Transparent poly bag not in used at BSR stage. 603_Occurance_Before.pptx |
Occurance (After) |
Transparent poly bag are being used at BSR stage. 603_Occurance_After.pptx |
Outflow (Before) |
SOP & Analysis: Material handling of Finish Product being supplied to Endurance not displayed at BSR. 603_Outflow_Before.pptx |
Outflow (After) |
SOP & Analysis: Material handling of Finish Product being supplied to Endurance displayed at BSR. 603_Outflow_After.pptx |
11. Horizontal Deployment
Horizontal Deployment Required | No |
Applicable Machine / Model / Plant | NA |
12. Document Review
Documents | ControlPlan, PFMEA, WISOP, PackingStd, InspCheckSheet |
Specify Other Document | NA |
13. Effectiveness Of Action
Reviewed Quantity | 5000 |
Reason for submission | Reviewed next 10 lots verified no mix up issues found ok |