QFR No - 8000878520
Defect Details
NC No. 8000878520
NC Date 15/06/2024
NC Submission Date
Part No. F2PH00902B
Part Name VALVE RETAINER (C101B)
Supplier Name & Code 101255-MAHAVIR INDUSTRIES
ETL Plant 1146-ETL Suspension Narasapura
Defect Details RUSTY-
 
1. Problem Description
Defect Description VALVE RETANIER RUST ISSUE
Detection Stage Inprocess
Problem Severity Aesthetic
NG Quantity 1004
Is Defect Repeatative? Yes
Defect Sketch / Photo bhpnhqxb2aqiqeo31315nure.gif
Supplier Communication Details
Quality Head Email ID quality@mahavirind.co.in
Plant Head/CEO Email ID production@mahavirind.co.in
MD Email ID
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
3200
1200
0
0
0
4400
Check Qty
3200
0
0
0
0
3200
NG Qty
1004
0
0
0
0
1004
 
Scrap 0
Rework 1004
Under Deviation 0
Containment Action
All Material Segregation at Customer End
 
3. Process Flow
Process Flow Description
RM inward - store - Parting - Semi finish Inward - CNC ( Counter ID Machining ) - OD Grinding- Plating - Final Inspection - Packing - Dispatch - Transport- warehouse
 
4. Process Details
Process / Operation Packing
Outsource No
Machine / Cell Packing Area
Machine / Cell No. Final Packing Area
5. Problem Analysis
Type Possible Cause Fact Verification Jud
Machinen incorrect curing machine was used for the plating drying processDuring Curing Process The correct drying machine was used.O
MethodDuring Finish Good material Handling at Narsapura Warehousen the warehouse, the bag became weak during the handling of the finished material, and due to the baX
Manskilled manpower of warehouseRegular man power of ware houseO
ToolManual handlingIn the warehouse, finished material is placed on the floor and dragged to the locationX
MaterialWithout Process Material Mix With finish MaterialAfter defect analysis, the material was found to be fully platedO
 
6. Inspection Method Analysis (Current)
Inspection Method Other
Other Inspection Method visual
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size Visual
7. Root Cause Analysis (Occurance)
Why 1 RUSTY-
Why 2 The warehouse ground floor was rough
Why 3 Finished goods were handled without a trolley
Why 4 The packing bag was torn during the handling of finished goods
Why 5
Root Cause (Occurance) Finished goods were handled without a trolley
 
Root Cause Analysis (Outflow)
Why 1 RUSTY-
Why 2 There is no awareness among the warehouse-deputed manpower regarding the handling of finished goods.
Why 3 There are no material handling work instructions displayed in the warehouse area
Why 4
Why 5
Root Cause (Outflow) There are no material handling work instructions displayed in the warehouse area.
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OutflowDisplay work instructions in the warehouse at the finished goods loading and unloading area.Quality Head And Warehouse Incharge.06/09/202409/09/2024Completed
OccuranceTrolley Arrange At Ware HouseWarehouse Owner09/09/202410/09/2024Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System Yes
Change Details Inspect the material condition and packing condition during the handover to the customer from the warehouse
Inspection Method Other
Other Inspection Method Visual
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100%
10. Evidance of Countermeasure
Occurance (Before) Finished goods were handled without a trolley
871_Occurance_Before.docx
Occurance (After) Trolley Arrange At Ware House
871_Occurance_After.jpg
Outflow (Before) There are no material handling work instructions displayed in the warehouse area.
871_Outflow_Before.docx
Outflow (After) Display work instructions in the warehouse at the finished goods loading and unloading area.
871_Outflow_After.jpg
 
11. Horizontal Deployment
Horizontal Deployment Required Yes
Applicable Machine / Model / Plant All Warehouse Materials
 
12. Document Review
Documents PFMEA, WISOP
Specify Other Document No
 
13. Effectiveness Of Action
Reviewed Quantity 20000
Reason for submission verified after received 4 lots found ok