QFR No - 8000879788
Defect Details
NC No. | 8000879788 |
NC Date | 25/06/2024 |
NC Submission Date | |
Part No. | 550KH03002 |
Part Name | REBOUND SPRING-PRFH-006 |
Supplier Name & Code | 101245-SAGAR SPRINGS PVT LTD |
ETL Plant | 1146-ETL Suspension Narasapura |
Defect Details | MIX UP OTHER MODEL-NOT USING KONF MIXUP AT SAGAR END |
1. Problem Description
Defect Description | Rebound spring length less and more issue ,mix up at Sagar Supplier end . not using in KONF front fork . |
Detection Stage | Inprocess |
Problem Severity | Fitment |
NG Quantity | 23 |
Is Defect Repeatative? | Yes |
Defect Sketch / Photo | wu0olraudhmga2svshmi0aw4.gif |
Supplier Communication Details
Quality Head Email ID | quality@sagarsprings.com |
Plant Head/CEO Email ID | sagrarsprings@gmail.com |
MD Email ID |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
13000
|
0
|
0
|
5000
|
0
|
18000
|
Check Qty |
13000
|
0
|
0
|
5000
|
0
|
18000
|
NG Qty |
23
|
0
|
0
|
0
|
0
|
23
|
Scrap | 23 |
Rework | 0 |
Under Deviation | 0 |
Containment Action |
---|
Scrap |
3. Process Flow
Process Flow Description |
---|
Coiling - Tempering - Grinding - Shot Peening - Tempering - Oiling - Final Inspection - Packing |
4. Process Details
Process / Operation | Oiling |
Outsource | No |
Machine / Cell | Oiling Tray |
Machine / Cell No. | Oiling |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|---|---|---|
Man | New operator | Senior operators working at all process stages | O |
Method | Mix up at production line during material handling | Parts separately processes and moved to next process stage | O |
Man | Untrained operator | Trained operators working at all process stages | O |
Method | Mix up at Inspection table | Part wise samples collected, inspected, move samples to container and moved to oiling | O |
Method | Mix up at oiling and packing | Similar looking parts being oiled & packed at same time | X |
6. Inspection Method Analysis (Current)
Inspection Method | Other |
Other Inspection Method | Visual Inspection |
Check Point at Final Inspection | Yes |
Checking Freq. | Sampling |
Sampling | No |
Sample Size | Sample pla |
7. Root Cause Analysis (Occurance)
Why 1 | Mix up at oiling & packing |
Why 2 | Other model springs mix up during oiling |
Why 3 | Similar looking springs oiled and packed at same time |
Why 4 | similar looking springs at same location for oiling |
Why 5 | One oiling tray available for oiling similar looking springs |
Root Cause (Occurance) | One oiling tray available for oiling similar looking springs |
Root Cause Analysis (Outflow)
Why 1 | Mix up of other model springs |
Why 2 | Mix up could not able to found during final inspection |
Why 3 | Mix up occurred after final inspection |
Why 4 | |
Why 5 | |
Root Cause (Outflow) | Mix up occurred after final inspection |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|---|---|---|---|---|
Occurance | Three oiling trays arranged to oil similar looking springs and prevent mix up | SSPL | 30/06/2024 | 30/06/2024 | Completed |
Outflow | After final inspection springs will be immediately oiled, packed and moved to dispatch. | SSPL | 30/06/2024 | 30/06/2024 | Completed |
9. Inspection Method After Customer Complaint
Change In Inspection System | No |
Change Details | No change |
Inspection Method | Other |
Other Inspection Method | Sampling inspection |
Check Point at Final Inspection | Yes |
Checking Freq. | Sampling |
Sampling | No |
Sample Size | sample pla |
10. Evidance of Countermeasure
Occurance (Before) |
One oiling tray available for oiling all models of rebound springs (similar looking springs) caused mix up 885_Occurance_Before.pptx |
Occurance (After) |
Two more oiling trays arranged to oil similar looking springs separately and prevent mix up 885_Occurance_After.pptx |
Outflow (Before) |
After final inspection oiling and packing as per packing plan 885_Outflow_Before.pptx |
Outflow (After) |
After final inspection immediately oiling, packing without delay to prevent mix up 885_Outflow_After.pptx |
11. Horizontal Deployment
Horizontal Deployment Required | Yes |
Applicable Machine / Model / Plant | Actions applicable for all rebound springs |
12. Document Review
Documents | PFMEA |
Specify Other Document | OPL |
13. Effectiveness Of Action
Reviewed Quantity | 1000 |
Reason for submission | Reviewed next two lots found ok |