QFR No - 8000879789
Defect Details
NC No. | 8000879789 |
NC Date | 25/06/2024 |
NC Submission Date | |
Part No. | 550KH03002 |
Part Name | REBOUND SPRING-PRFH-006 |
Supplier Name & Code | 101245-SAGAR SPRINGS PVT LTD |
ETL Plant | 1146-ETL Suspension Narasapura |
Defect Details | BEND- |
1. Problem Description
Defect Description | Rebound Spring bend issue . |
Detection Stage | Inprocess |
Problem Severity | Fitment |
NG Quantity | 2 |
Is Defect Repeatative? | Yes |
Defect Sketch / Photo |
Supplier Communication Details
Quality Head Email ID | quality@sagarsprings.com |
Plant Head/CEO Email ID | sagarsprings@gmail.com |
MD Email ID |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
15000
|
0
|
0
|
5000
|
0
|
20000
|
Check Qty |
15000
|
0
|
0
|
5000
|
0
|
20000
|
NG Qty |
2
|
0
|
0
|
0
|
0
|
2
|
Scrap | 2 |
Rework | 0 |
Under Deviation | 0 |
Containment Action |
---|
Scrap |
3. Process Flow
Process Flow Description |
---|
Coiling - Tempering - Grinding - Shot Peening - Tempering - Oiling - Packing |
4. Process Details
Process / Operation | Material Handling / Movement between operations |
Outsource | No |
Machine / Cell | Material Handling / Movement between operations |
Machine / Cell No. | Trolley |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|---|---|---|
Man | Untrained operator | Trained operators working at all process stages | O |
Method | Spring bend during material handling | Material handled / moved in trolleys and potential chances of bend | X |
Man | New operator | Experienced operators working at all process atages | O |
6. Inspection Method Analysis (Current)
Inspection Method | Other |
Other Inspection Method | Sampling inspection |
Check Point at Final Inspection | Yes |
Checking Freq. | Sampling |
Sampling | No |
Sample Size | sample pla |
7. Root Cause Analysis (Occurance)
Why 1 | Spring bend during material handling |
Why 2 | Material handling in trolleys caused bend |
Why 3 | During material unloading springs fallen on ground and trolly wheel passed on spring and same springs got mixed up with lot |
Why 4 | Material handling trolley design constrain |
Why 5 | |
Root Cause (Occurance) | Material handling trolley design constrain |
Root Cause Analysis (Outflow)
Why 1 | Spring Bend |
Why 2 | Spring bend problem could not able to detect at final inspection |
Why 3 | Sampling inspection |
Why 4 | |
Why 5 | |
Root Cause (Outflow) | Sampling inspection |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|---|---|---|---|---|
Occurance | New model trolley designed to handle / move rebound springs to prevent bend | SSPL | 30/06/2024 | 30/06/2024 | Completed |
Outflow | Visual inspection will be done after final inspection for free from bend & before oiling and packing | SSPL | 30/06/2024 | 30/06/2024 | Completed |
9. Inspection Method After Customer Complaint
Change In Inspection System | Yes |
Change Details | Visual Inspection |
Inspection Method | Other |
Other Inspection Method | Visual Inspection |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | 100% Visua |
10. Evidance of Countermeasure
Occurance (Before) |
Material handling trolley design constraint causing spring bend during unloading springs 886_Occurance_Before.pptx |
Occurance (After) |
Trolley design modified to prevent spring bend issue 886_Occurance_After.pptx |
Outflow (Before) |
At final Inspection sampling inspection followed caused non detection of spring bend 886_Outflow_Before.pptx |
Outflow (After) |
After final inspection visual inspection before coiling to detect spring bend issue 886_Outflow_After.pptx |
11. Horizontal Deployment
Horizontal Deployment Required | Yes |
Applicable Machine / Model / Plant | Action applicable for all rebound springs |
12. Document Review
Documents | PFMEA |
Specify Other Document | OPL |
13. Effectiveness Of Action
Reviewed Quantity | 10000 |
Reason for submission | Reviewed next two lots found ok no issue . |