QFR No - 8000882626
Defect Details
NC No. | 8000882626 |
NC Date | 15/07/2024 |
NC Submission Date | |
Part No. | F2FA10933M |
Part Name | FORK PIPE MACHINED - J1A |
Supplier Name & Code | 101030-TUBE INVESTMENTS OF INDIA LTD |
ETL Plant | 1117-ETL K-228/9 Suspension |
Defect Details | NOT AS PER SPECIFICATION-DU BUSH OD O/S |
1. Problem Description
Defect Description | DU BUSH OD O/S |
Detection Stage | Receipt |
Problem Severity | Safety |
NG Quantity | 32 |
Is Defect Repeatative? | Yes |
Defect Sketch / Photo |
Supplier Communication Details
Quality Head Email ID | AmitVD@tii.murugappa.com |
Plant Head/CEO Email ID | guptaajay@tii.murugappa.com |
MD Email ID | mukeshahuja@tii.murugappa.com |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
600
|
0
|
0
|
0
|
0
|
600
|
Check Qty |
600
|
0
|
0
|
0
|
0
|
600
|
NG Qty |
32
|
0
|
0
|
0
|
0
|
32
|
Scrap | 32 |
Rework | 0 |
Under Deviation | 0 |
Containment Action |
---|
All Stock available at ETL end & Inhouse checked for the DU Bush OD Parameter |
3. Process Flow
Process Flow Description |
---|
Raw Material Inspection- Machining (Cualking & Threading)-Drilling-Oiling-Final Inspection-Dispatch |
4. Process Details
Process / Operation | Machining |
Outsource | No |
Machine / Cell | CNC Machine Cell |
Machine / Cell No. | Machine No.22/23 |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|---|---|---|
Machine | The Feed Value Not OK | the feed Value of turning was over defined up to 0.18 Inch/Min | X |
Method | Due to not get detected by the operator during the inspection by define frequency. | Due to sampling basis inspection carried out for 1 Nos. after 30 Nos. | X |
6. Inspection Method Analysis (Current)
Inspection Method | Gauge |
Other Inspection Method | |
Check Point at Final Inspection | Yes |
Checking Freq. | Sampling |
Sampling | No |
Sample Size | 1 Nos./30 |
7. Root Cause Analysis (Occurance)
Why 1 | DU Bush OD oversize |
Why 2 | DU Bush OD oversize |
Why 3 | On the machine, the feed of turning was found to be higher. |
Why 4 | The feed Value of turning was over-defined up to 0.18 Inch/Min |
Why 5 | |
Root Cause (Occurance) | The feed Value of turning was over-defined up to 0.18 Inch/Min |
Root Cause Analysis (Outflow)
Why 1 | DU Bush OD oversize |
Why 2 | Due to not get detected by the operator during the inspection by define frequency. |
Why 3 | Due to sampling basis inspection carried out for 26 Nos. after 500 Nos. |
Why 4 | |
Why 5 | |
Root Cause (Outflow) | Due to sampling basis inspection carried out for 1 Nos. after 30 Nos. |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|---|---|---|---|---|
Outflow | Before the Complaint Machining stage, the inspection frequency was set as Sampling Plan 26/500 Nos., which is not adequate for detection. DU bush OD Parameter Inspection frequency revised & Doubled by 52/500 Nos. | Mr. Dethe SS | 23/07/2024 | 23/07/2024 | Completed |
Occurance | After Validation feed Value of turning was defined as 0.16 inch/Min instead of 0.18 Inch/Min | Mr. Rathod | 23/07/2024 | 23/07/2024 | Completed |
9. Inspection Method After Customer Complaint
Change In Inspection System | Yes |
Change Details | Before the Complaint Machining stage, the inspection frequency was set as Sampling Plan 26/500 Nos., which is not adequate for detection. DU bush OD Parameter Inspection frequency revised & Doubled by 52/500 Nos. |
Inspection Method | Gauge |
Other Inspection Method | |
Check Point at Final Inspection | Yes |
Checking Freq. | Sampling |
Sampling | No |
Sample Size | 52 Nos/500 |
10. Evidance of Countermeasure
Occurance (Before) |
The feed Value of turning was over-defined up to 0.18 Inch/Min 935_Occurance_Before.pdf |
Occurance (After) |
After Validation feed Value of turning was defined as 0.16 inch/Min instead of 0.18 Inch/Min 935_Occurance_After.pdf |
Outflow (Before) |
Before the Complaint Machining stage, the inspection frequency was set as Sampling Plan 26/500 Nos., which is not adequate for detection 935_Outflow_Before.pdf |
Outflow (After) |
DU bush OD Parameter Inspection frequency revised & Doubled by 52/500 Nos. 935_Outflow_After.pdf |
11. Horizontal Deployment
Horizontal Deployment Required | Yes |
Applicable Machine / Model / Plant | All Model |
12. Document Review
Documents | WISOP, InspCheckSheet |
Specify Other Document | Sampling Plan |
13. Effectiveness Of Action
Reviewed Quantity | 144 |
Reason for submission | ok |