QFR No - 8000896053
Defect Details
NC No. 8000896053
NC Date 17/10/2024
NC Submission Date
Part No. F2FQ00407B
Part Name HOLDER HANDLE UPPER P/C (XF-521)
Supplier Name & Code 201092-PRANEEL INDUSTRIES
ETL Plant 1117-ETL K-228/9 Suspension
Defect Details DENT MARK-DENT DAMAGE
 
1. Problem Description
Defect Description Dent mark
Detection Stage Receipt
Problem Severity Aesthetic
NG Quantity 3
Is Defect Repeatative? Yes
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID quality@praneelgroup.com
Plant Head/CEO Email ID praneelindustries@rediiffmail.com
MD Email ID anilpatil@praneelgroup.com
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
216
0
0
0
100
316
Check Qty
216
0
0
0
100
316
NG Qty
3
0
0
0
8
11
 
Scrap 11
Rework 0
Under Deviation 0
Containment Action
All material at ETL end and In-house material verify and rejected at ETL end also at in-house stage.
 
3. Process Flow
Process Flow Description
Raw casting inward =>Drilling =>Powder Coating=>Powder Coating inward=>VMC Machining=>De-burring=>Final Inspection=>Packing and Dispatch.
 
4. Process Details
Process / Operation VMC MACHINING
Outsource No
Machine / Cell VMC Cell
Machine / Cell No. VMC machine
5. Problem Analysis
Type Possible Cause Fact Verification Jud
MethodDeburring not done as per work instruction given.Verify the deburring method by operator and found inadequate.X
ManFinal inspector not as per skill matrix.Verify the skill matrix for final inspector and found inspector as per skill matrix.O
MachineMachine parameter required not as per control planVerify the machine parameter as clamping pressure found ok.O
MaterialMaterial specifications not as per drawing.Verify the material specification with MTC and found as per drawing.O
ToolRequired tooling for part production not as per standard.Verify the toolings for production and found adequate.O
 
6. Inspection Method Analysis (Current)
Inspection Method Other
Other Inspection Method Visual Inspection.
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100%
7. Root Cause Analysis (Occurance)
Why 1 Dent damage issue on the parts.
Why 2 Clamping pressure not as per control plan specifications.
Why 3 Part handling not done as per material handling WI.
Why 4 De-burring process not done properly as per WI.
Why 5
Root Cause (Occurance) De-burring process not done properly as per WI.
 
Root Cause Analysis (Outflow)
Why 1 Dent damage issue on the parts.
Why 2 Parts skipped by inspector during final inspection.
Why 3 During material packing dent damages done.
Why 4 Awareness not available to inspector as well as packing person for dent damage issue.
Why 5
Root Cause (Outflow) Awareness not available to inspector as well as packing person for dent damage issue.
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OccuranceTraining given to operator of de-burring process for de-burring should be done as per WI display.Mr. Sudarshan Kadam18/10/202418/10/2024Completed
OutflowTraining and awareness given to final inspector as well as packing person for dent damage issue.Mr.Yogesh Sonune18/10/202418/10/2024Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System No
Change Details ---
Inspection Method Other
Other Inspection Method Visual Inspection
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100%
10. Evidance of Countermeasure
Occurance (Before) Operator not aware about dent damage issue on the parts.
1165_Occurance_Before.pptx
Occurance (After) Training and awareness given to operator for de-burring on the parts.
1165_Occurance_After.pptx
Outflow (Before) No any awareness about dent damage issue observed on the parts.
1165_Outflow_Before.pptx
Outflow (After) Training and awareness given to final inspector for dent damage issue observed on the parts also Q alert display for the raise concern by ETL.
1165_Outflow_After.pptx
 
11. Horizontal Deployment
Horizontal Deployment Required Yes
Applicable Machine / Model / Plant Handle Holder Lower
 
12. Document Review
Documents WISOP
Specify Other Document Q-Alert
 
13. Effectiveness Of Action
Reviewed Quantity 50
Reason for submission OK