QFR No - 7001012537
Defect Details
NC No. 7001012537
NC Date 10/05/2024
NC Submission Date
Part No. 550GN09102
Part Name MAIN SPRING-(HMS-30 & HMP-30)
Supplier Name & Code 100186-SAGAR SPRINGS PRIVATE LIMITED
ETL Plant 1143-ETL Suspension Halol, Vadodara
Defect Details LENGTH OVERSIZE-Total Length 358.5 mm against 348.7 ±2mm
 
1. Problem Description
Defect Description Total Length 358.5 mm against 348.7 ±2mm
Detection Stage Receipt
Problem Severity Function
NG Quantity 306
Is Defect Repeatative? No
Defect Sketch / Photo 5zrawr3bwbr43c12lheq2hfv.jpg
Supplier Communication Details
Quality Head Email ID quality@sagarsprings.com
Plant Head/CEO Email ID ajai.singh@sagarsprings.com
MD Email ID sagar@sagarsprings.com
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
13600
0
0
6000
0
19600
Check Qty
13600
0
0
6000
0
19600
NG Qty
306
0
0
2
0
308
 
Scrap 306
Rework 0
Under Deviation 0
Containment Action
100%inspection at ETL Halol plant
 
3. Process Flow
Process Flow Description
coiling, tempring, grinding, shot peening 2nd tempring, scragging, waviness, checking
 
4. Process Details
Process / Operation Final inspection
Outsource No
Machine / Cell Final inspection
Machine / Cell No. Final inspection
5. Problem Analysis
Type Possible Cause Fact Verification Jud
MethodMix up of other partPossibility of mix up of other model mix up next to temperingO
MethodInspection method for height checking wrongHeight checking of spring by checking gauge is found OKO
ManOperator negliganceNo negligence foundO
 
6. Inspection Method Analysis (Current)
Inspection Method Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100%
7. Root Cause Analysis (Occurance)
Why 1 Other model spring get mix at tempering stage
Why 2 While line change over spring mix with existing spring
Why 3 While line change over when furnace operator goes for material movement another model parts get drop
Why 4 Small trolley used is not carry enough spring and there arise chance for mix up
Why 5
Root Cause (Occurance) Method for using small trolley for material movement after tempering get filled quickly till operator empty tempered material to decided location, hence in case material get mixed at furnace where spare trolley is kept
 
Root Cause Analysis (Outflow)
Why 1 Free length (mix up) is not checked at final oiling stage
Why 2 Free length is checked 100% at waviness correction stage and spring get mix after it
Why 3
Why 4
Why 5
Root Cause (Outflow) Model mix up is not check at final oiling stage
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OccuranceLarge bin will be kept at exit of furnace which avoid frequent transportation and could store more spring at time and operator could easily work on it while change overProduction-Supervisor12/05/202412/05/2024Completed
Outflow100% mix up is checked on final oiling stage by making spring stand vertical on platePacking - Crew12/05/202412/05/2024Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System Yes
Change Details Model mix up inspection started at final oiling-packing stage
Inspection Method Other
Other Inspection Method Visual
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100%
10. Evidance of Countermeasure
Occurance (Before) While line change over when furnace operator goes for material movement another model parts get drop. Small trolley used is not carry enough spring and there arise chance for mix up
796_Occurance_Before.pdf
Occurance (After) Large bin will be kept at exit of furnace which avoid frequent transportation and could store more spring at time and operator could easily work on it while change over
796_Occurance_After.pdf
Outflow (Before) Free length (mix up) is not checked at final oiling stage
796_Outflow_Before.pdf
Outflow (After) 100% mix up is checked on final oiling stage by making spring stand vertical on plate.
796_Outflow_After.pdf
 
11. Horizontal Deployment
Horizontal Deployment Required Yes
Applicable Machine / Model / Plant All long and slender Main spring
 
12. Document Review
Documents ControlPlan, PFMEA, WISOP
Specify Other Document OPL
 
13. Effectiveness Of Action
Reviewed Quantity
Reason for submission