QFR No - 7001019734
Defect Details
NC No. 7001019734
NC Date 01/06/2024
NC Submission Date
Part No. F2PH00902B
Part Name VALVE RETAINER (C101B)
Supplier Name & Code 100106-SHARP ENGINEERS.
ETL Plant 1136-ETL Suspension Sanand
Defect Details HIGHT U/SIZE.-Total Width undersize
 
1. Problem Description
Defect Description Total width undersize, Specification 9.3 mm observation 8.75 mm
Detection Stage Receipt
Problem Severity Fitment
NG Quantity 4670
Is Defect Repeatative? No
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID quality@apw3.co.in
Plant Head/CEO Email ID kurund.ma@sharp-engineers.com
MD Email ID urkhandelwal@sharp-engineers.com
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
10000
0
5000
0
10000
25000
Check Qty
10000
0
5000
0
10000
25000
NG Qty
4670
0
0
0
0
4670
 
Scrap 4670
Rework 0
Under Deviation 0
Containment Action
Segregation done for all the suspected material of pipeline and defective part removed from OK part and quarantine.
 
3. Process Flow
Process Flow Description
10) RM inward 20) RM Storage 30) Parting 40) CNC 1st set up 50) OD grinding 60) Plating (Outsource) 70) Inward Inspection 80) Final inspection 90) Pr-dispatch inspection 100) Packing & forwarding.
 
4. Process Details
Process / Operation CNC Machining
Outsource No
Machine / Cell Machine Shop
Machine / Cell No. SE/CNC 01
5. Problem Analysis
Type Possible Cause Fact Verification Jud
ManUnskilled manpowerSkilled manpower availableO
ToolTool/Insert worn outTool life monitoring as per defined frequency available in the machine interlock.O
MachineMachine VariationJH/PM as per defined frequencyO
MaterialSuspected NG part in the pipeline materialPipeline material was NG and not recalled after receipt of customer complaintX
MethodIncorrect checking methodcommon method for inspection by attribute type height gaugeO
 
6. Inspection Method Analysis (Current)
Inspection Method Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 1:1
7. Root Cause Analysis (Occurance)
Why 1 Total length under part reached at ETL
Why 2 NG material of pipeline not recalled
Why 3 Because of line stoppage
Why 4
Why 5
Root Cause (Occurance) NG material of pipeline not recalled
 
Root Cause Analysis (Outflow)
Why 1 Total length under part reached at ETL
Why 2 not detected in the final inspection
Why 3 Taper observed at one side of the parts
Why 4
Why 5
Root Cause (Outflow) Taper observed at one side of the parts
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OccuranceInventory level of ware house for VALVE RETAINER increase as per defined scheduled qtyMr. Kurund M.A.20/06/202420/06/2024Completed
OutflowPart are being checked at both side of the part by attribute type height gauge 100% before dispatch. inspector identification tag are being provided for traceability purposeMr. Shaikh L.N20/06/202420/06/2024Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System Yes
Change Details Component are being checked at both side of the part by attribute type height gauge 100% before dispatch.
Inspection Method Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 1:1
10. Evidance of Countermeasure
Occurance (Before) NG material of pipeline not recalled because of less material inventory level at warehouse.
833_Occurance_Before.pptx
Occurance (After) Inventory level of ware house for VALVE RETAINER increase as per defined scheduled qty.
833_Occurance_After.xlsx
Outflow (Before) Taper observed at one side of the parts, inspection done only one side of the part.
833_Outflow_Before.pptx
Outflow (After) Part are being checked at both side of the part by attribute type height gauge 100% before dispatch. inspector identification tag are being provided for traceability purpose
833_Outflow_After.pptx
 
11. Horizontal Deployment
Horizontal Deployment Required No
Applicable Machine / Model / Plant NA
 
12. Document Review
Documents ControlPlan, PFMEA, WISOP, InspCheckSheet
Specify Other Document NA
 
13. Effectiveness Of Action
Reviewed Quantity 5
Reason for submission Total width undersize