QFR No - 8000851792
Defect Details
NC No. 8000851792
NC Date 10/11/2023
NC Submission Date
Part No. 520HL00102
Part Name OIL LOCK COLLAR K60
Supplier Name & Code 101255-MAHAVIR INDUSTRIES
ETL Plant 1117-ETL K-228/9 Suspension
Defect Details NOT AS PER SPECIFICATION-TOTAL LENGTH UNDERSIZE
 
1. Problem Description
Defect Description Total Length undersize
Detection Stage Inprocess
Problem Severity Function
NG Quantity 8
Is Defect Repeatative? Yes
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID quality@mahavir.in.co.in
Plant Head/CEO Email ID planthead@mahavirind.co.in
MD Email ID
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
1000
0
0
1200
0
2200
Check Qty
1000
0
0
1200
0
2200
NG Qty
8
0
0
0
0
8
 
Scrap 8
Rework 0
Under Deviation 0
Containment Action
All suspected finish good material segregation at customer end
 
3. Process Flow
Process Flow Description
Raw material Inward - store - Traub ( Final Length+ ID Chamfer+ OD Groove)- Back Side Chamfer - Cross Drilling - Inward Inspection- OD Grinding - Zinc Plating- Final Inspection - Packing - Dispatch
 
4. Process Details
Process / Operation Traub -Final Length
Outsource Yes
Machine / Cell Traub Machine-03
Machine / Cell No. Traub Section
5. Problem Analysis
Type Possible Cause Fact Verification Jud
MachineBend Pipe /Job Pusher Not Proper WorkingWeight balance Not Sufficient for Bend Pipe PushO
 
6. Inspection Method Analysis (Current)
Inspection Method Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100%
7. Root Cause Analysis (Occurance)
Why 1 TOTAL LENGTH UNDERSIZE
Why 2 Parting Pipe not Rest to as per Required Length job stopper.
Why 3 Parting Pipe Not Push By Pusher Due to Weight balancer Weight Low .
Why 4 Weight Balancer Not Sufficient For Bend Pipe Push.
Why 5
Root Cause (Occurance) Weight Balancer Not Sufficient For Bend Pipe Push.
 
Root Cause Analysis (Outflow)
Why 1 TOTAL LENGTH UNDERSIZE
Why 2 During Final Inspection Length Under Size Part Not Deduct
Why 3 Sampling Frequency Low
Why 4
Why 5
Root Cause (Outflow) Sampling Frequency Low
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OccuranceWeight Balancer Not Sufficient For Bend Pipe Push.Mr. Pralhad Bhawar13/11/202314/11/2023Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System Yes
Change Details 100% at Final stage and Ghoda gauge Provide On Traub Machine .
Inspection Method Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100%
10. Evidance of Countermeasure
Occurance (Before) Weight Balancer Not Sufficient before Weight Was 4 Kg
597_Occurance_Before.pptx
Occurance (After) Weight Balancer Weight Increase -Now 6Kg For Regular Pipe Or Bend Pipe Pushing Purpose.
597_Occurance_After.pptx
Outflow (Before) Ghoda Gauge Not Available On Traub Machine .
597_Outflow_Before.pptx
Outflow (After) Ghoda Gauge Provide On Traub Machine.
597_Outflow_After.pptx
 
11. Horizontal Deployment
Horizontal Deployment Required Yes
Applicable Machine / Model / Plant All Oil Lock Coller
 
12. Document Review
Documents ControlPlan, PFMEA
Specify Other Document No
 
13. Effectiveness Of Action
Reviewed Quantity
Reason for submission